Polymetal International plc (“Polymetal”, the “Company” or the Group) announces the Group's preliminary results for the year ended 31 December 2023.
“In 2023, Polymetal managed to stay profitable and reduce leverage despite persistent geopolitical headwinds. Robust production and stable cost performance coupled with favorable commodity price dynamics drove improvement in financial results. In 2024, after the sale of the Russian assets is completed, the Company will pursue long-term growth while ensuring long-term free cash flow potential of the existing assets in Kazakhstan”, said Vitaly Nesis, Group CEO of Polymetal International plc, commenting on the results.

FINANCIAL HIGHLIGHTS
In 2023, revenue increased by 8% year-on-year (y-o-y), totalling US$ 3,025 million (2022: US$ 2,801 million), of which US$ 893 million (30%) was generated from operations in Kazakhstan and US$ 2,132 million (70%) from operations in the Russian Federation. Average realised gold price increased by 9% while silver price increased by 4%, both closely tracking market dynamics. Gold equivalent (GE) production was stable at 1,714 Koz y-o-y. Gold sales increased by 2% y-o-y to 1,400 Koz, while silver sales decreased by 10% to 16.6 Moz. Significant tightening of concentrate exports regulations in Russia led to material accumulation of concentrates in sea ports.

Group Total Cash Costs (TCC) for 2023 were US$ 861/GE oz, down 9% y-o-y, and 9% below the lower end of the Group’s guidance of US$ 950-1,000/GE oz. This was predominantly on the back of a weaker Rouble which outweighed inflationary pressures. In Kazakhstan, TCC were US$ 903/GE oz, up by 24% y-o-y, on the back of a planned grade decline combined with a 14% decrease in sales volumes and inflationary headwinds. Across the Group’s Russian mines, TCC were at US$ 845/GE oz, down by 19% y-o-y, mainly on the back of Rouble depreciation.

All-in Sustaining Cash Costs (AISC)1 amounted to US$ 1,276/GE oz, down 5% y-o-y, 2% below the lower end of the Group’s guidance of US$ 1,300-1,400/GE and driven by the same factors. In Kazakhstan, AISC increased by 18% to US$ 1,263/GE oz, mostly driven by a decrease in sales volume. In Russia, AISC decreased by 13% to US$ 1,281/oz, on the back of a sales increase coupled with lower stripping volumes after completion of large stripping campaigns in 2023.

Adjusted EBITDA1 was US$ 1,458 million, 43% higher than in 2022, on the back of higher commodity prices and lower cash costs. Of this, US$ 439 million (30%) was earned from operations in Kazakhstan and US$ 1,019 million (70%) earned from operations in the Russian Federation. The Adjusted EBITDA margin increased by 12 percentage points to 48% (2022: 36%).
Underlying net earnings increased by 40%, totalling US$ 615 million (2022: US$ 440 million), with a basic EPS of US$ 1.11 per share. Reflecting the increase in operating profit, the Group recorded a net profit of US$ 528 million in 2023, compared to a net loss of US$ 288 million due to one-off impairment charges in 2022.
Capital expenditure was US$ 679 million , down 14% compared with US$ 794 million in 2022 and 3% below the lower end of the guidance range of US$ 700-750 million, as a result of the substantial positive impact of Russian Rouble devaluation on local-currency costs.
Net operating cash inflow was US$ 575 million (2022: US$ 206 million). The Group reported negative free cash flow1 of US$ 128 million in 2023, which is still a significant improvement over the 2022 negative free cash flow of US$ 445 million.
Net debt2 was largely stable at US$ 2,383 million (US$ 174 million in Kazakhstan and US$ 2,209 million in Russia), compared with US$ 2,393 million as at 31 December 2022 (US$ 277 million in Kazakhstan and US$ 2,117 million in Russia). This represents 1.64x of Adjusted EBITDA and is significantly below the 2022 leverage ratio of 2.35x.
DIVIDENDS AND DISPOSAL
On 19 February 2024, the Group announced its intention to sell 100% of JSC Polymetal and its subsidiaries to JSC Mangazeya Plus for an effective total consideration of approximately US$ 3.69 billion, valuing JSC Polymetal and its subsidiaries at 5.3x EV/EBITDA based on Adjusted EBITDA of JSC Polymetal and its subsidiaries for the 12 months ended 30 June 2023 (US$ 694 million) and at 3.6x based on an full year 2023 Adjusted EBITDA of JSC Polymetal and its subsidiaries (approximately US$ 1.0 billion). On 7 March, 2024 the transaction was approved by the Shareholders General Meeting and, following receipt of required regulatory approvals, was completed on the same day.
Following the disposal, the Group’s net cash position of approx. US$ 130 million.
No dividend will be proposed for the full year 2023. Following the recent completion of the divestment of the Russian business, the Board will actively reconsider the dividend policy and intend to share an update in May this year.
FINANCIAL HIGHLIGHTS 20232022Change

Revenue, US$m
Kazakhstan893933-4%
Russia2,1321,868+14%
Total3,0252,801+8%

Total cash cost , US$ /GE oz
Kazakhstan903728+24%
Russia8451,046-19%
Total861942-9%
All-in sustaining cash cost2, US$ /GE oz
Kazakhstan1,263 1,0673+18%
Russia1,281 1,4803-13%
Total1,2761,344-5%

Adjusted EBITDA2, US$m
Kazakhstan439516 -15%
Russia1,0195013+103%
Total1,4581,017+43%

Average realised gold price , US$ /oz1,9291,764+9%
Average realised silver price4, US$ /oz22.821.9+4%

Net earnings/(loss), US$m528(288)n/a
Underlying net earnings2, US$m615440+40%
Return on assets (underlying)2, %17%9%+8%
Return on equity (underlying)2, %15%11%+4%

Basic earnings/(loss) per share, US$1.11(0.61) n/a
Underlying EPS2, US$1.300.93+44%

Net debt2, US$m
Kazakhstan174277-37%
Russia 2,209 2,117+4%
Total 2,383 2,393-0%

Net debt/Adjusted EBITDA
Kazakhstan0.390.54-27%
Russia2.174.23-49%
Total1.63 2.35-31%

Capital expenditure, US$m
Kazakhstan145101+43%
Russia534693-23%
Total679794-14%

Net operating cash flow, US$m575206+179%
Free cash flow2, US$m(128)(445)+71%
Free cash flow post-M&A2, US$m(131)(473)+72%

Notes:
(1) Totals may not correspond to the sum of the separate figures due to rounding. % changes can be different from zero even when absolute amounts are unchanged because of rounding. Likewise, % changes can be equal to zero when absolute amounts differ due to the same reason. This note applies to all tables in this release.
(2) Defined in the “Alternative performance measures” section below.

OPERATING HIGHLIGHTS
No fatal accidents among the Group’s employees and contractors occurred in 2023 as well as no lost time injuries were recorded in Kazakhstan. Lost time injury frequency rate (LTIFR) among the Company’s workforce for the full year decreased by 30% y-o-y to 0.07. Two serious and eight minor lost-time accidents were recorded in 2023, all in Russia. Days lost due to work-related injuries (DIS) increased by 32% y-o-y to 1,156, also relates to Russia.
The Company’s 2023 GE production was stable at 1,714 Koz, including 486 Koz in Kazakhstan and 1,228 Koz in Russia, and in line with the original production guidance of 1.7 Moz.
The Company has successfully secured a land plot for the Ertis POX project in the Pavlodar Special Economic Zone in Kazakhstan.


20232022Change

PRODUCTION (Koz of GE) 11,7141,720-0%
Kazakhstan486541-10%
Kyzyl316330-4%
Varvara169211-20%
Russia1,2281,178+4%

SAFETY
LTIFR2 (Employees)0.070.10-30%
Kazakhstan00n/a
Russia0.090.12-25%
DIS21,156877+32%
Kazakhstan00n/a
Russia1,156877+32%
Fatalities
Employees00n/a
Contractors00n/a
Average headcount14,64714,694-0.3%
Kazakhstan3,2023,219-0.5%
Russia11,445311,475-0.3%
Notes:
(1) Based on 80:1 Au/Ag conversion ratio and excluding base metals. Discrepancies in calculations are due to rounding. Mayskoye production reporting approach was amended to record production as soon as the ownership title for gold is transferred to a buyer at the mine site’s concentrate storage facility. Previous periods were restated accordingly.
(2) Company employees only are taken into account.
(3) The average number of personnel was revised versus the number reported in January 2024 to include average headcount of all assets in Russia that were deconsolidated during the reporting year and were not part of Group as at 31 December 2023, for the period they were part of the Group.
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (“ESG”) HIGHLIGHTS
Our 2023 group-wide direct and indirect energy-related emissions (Scope 1 and Scope 2) increased by 5% compared to 2022. In Kazakhstan our Scope 1 and Scope 2 emissions increased by 10% compared to 2022 mainly due to the legislative changes in the energy market and the resulting inability to purchase green electricity from the grid. We are currently focusing our efforts on the Kazakhstan segment and on designing our own solar power plants with a total capacity of up to 40 MW at Varvara and Kyzyl to minimize our dependence on grid electricity.
We continue to reforest territories equal to those that had been disturbed by our activities. In 2023, we planted 430 thousand saplings on almost 200 hectares of land in Russia and were implementing a voluntary pilot project to plant a new forest not far from Varvara site in Kazakhstan.
In 2023, we decreased our fresh water intensity for ore processing by 53%, compared with 2019, to 125 m³/1,000 t (2022: 49%). In Kazakhstan, we have also continued to decrease our fresh water intensity as the majority of the water we use in ore processing at our cites in Kazakhstan is circulated in closed water cycles. Overall, 90% of our on-site water consumption in Kazakhstan is via a closed cycle of treated waste.
Polymetal’s social investments amounted to US$ 17.6 million in 2023, including US$ 7.3 million in Kazakhstan, and were targeted to projects in education, local infrastructure, sports and culture.
2024 OUTLOOK FOR KAZAKHSTAN BUSINESS
The Company expects its Kazakhstan assets to deliver stable production at 475 Koz of GE.
Costs are estimated in the ranges of US$ 900-1,000/GE oz for TCC and US$ 1,250-1,350/GE oz for AISC . A y-o-y increase is expected mostly due to sharp increases in power and railway tariffs in Kazakhstan.
Capital expenditures are expected to be approximately US$ 225 million including US$ 60 million for Ertis POX.


CONFERENCE CALL AND WEBCAST
The Company will hold a webcast on Friday, 15 March 2024, at 16:00 Astana time (11:00 London time).
To participate in the webcast, please register using the following link:
https://streamstudio.world-television.com/1451-2739-39231/en
Webcast details will be sent to you via email after registration.
Enquiries
Investor RelationsMedia
Evgeny Monakhov
+44 20 7887 1475 (UK)

Kirill Kuznetsov
Alikhan Bissengali
+7 7172 47 66 55 (Kazakhstan)
ir@polymetalinternational.com
Yerkin Uderbay
+7 7172 47 66 55 (Kazakhstan)
media@polymetal.kz



FORWARD-LOOKING STATEMENTS

This release may include statements that are, or may be deemed to be, “forward-looking statements”. These forward-looking statements speak only as at the date of this release. These forward-looking statements can be identified by the use of forward-looking terminology, including the words “targets”, “believes”, “expects”, “aims”, “intends”, “will”, “may”, “anticipates”, “would”, “could” or “should” or similar expressions or, in each case their negative or other variations or by discussion of strategies, plans, objectives, goals, future events or intentions. These forward-looking statements all include matters that are not historical facts. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the company’s control that could cause the actual results, performance or achievements of the company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the company’s present and future business strategies and the environment in which the company will operate in the future. Forward-looking statements are not guarantees of future performance. There are many factors that could cause the company’s actual results, performance or achievements to differ materially from those expressed in such forward-looking statements. The company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the company’s expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based.


TABLE OF CONTENTS

SINED’s statement7
Group CEO statement9
Operating review 11
Financial review 18
Principal risks and uncertainties 30
Going concern 31
Directors’ responsibility statement 32
Financial statements 33
Alternative Performance Measures 64


SINED’S STATEMENT

It has been gratifying to see the Company’s financial and operating performance stabilise during 2023 against the continuing and tightening backdrop of a continued Russia-Ukraine conflict and new sanctions (including the designation of the Russian business of the Company by the US in May 2023) and counter-sanctions. The Board believed that under these circumstances fully divesting the Russian assets and pursuing growth in Kazakhstan and other Central Asian countries would greatly increase the Company’s ability to generate value for shareholders. And, already in 2024, the long-anticipated restructuring of the business was completed, and we are positively looking into the future.

Re-domiciliation to Kazakhstan
Back in 2022, given the rapid deterioration of the business environment caused by the Russian invasion of Ukraine, the Board set up a Special Committee, comprised of Independent Non-Executive Directors, to review the options open to the Company, which would enable it to preserve business continuity and restore shareholder value. Its first recommendation was that Polymetal International should switch its domicile from Jersey to Kazakhstan. It had been the first foreign company listed on the Astana Stock Exchange (AIX) in 2019 and, following re-domiciliation in August 2023, Polymetal has been able to switch from LSE to AIX as its primary listing.
This decision was not taken lightly since, as a consequence, its premium listing on the London Stock Exchange was cancelled. However, this was felt to be necessary in order to mitigate the impact of Russian counter-sanctions being imposed against entities incorporated in unfriendly jurisdictions (including Jersey), as well the prospect of further reprisals. Both would place significant restrictions on the Company and expose it to unmanageable risk.
Choosing the Astana International Finance Centre (AIFC) as the jurisdiction for our re-domiciliation was also prudent given AIFC’s own adoption of English common law and adherence to best practice. We too will continue to uphold the standards that we have set ourselves over the last 25 years in corporate governance, health and safety, and approach to environmental matters.

The divestment of Russian assets
However, a further strategic pivot was required following the US Department of State designation of JSC Polymetal and its subsidiaries in Russia. The Special Committee was once again deployed to develop an appropriate response in the light of these new sanctions. In the first instance, the Group’s Russian subsidiaries were ring-fenced, with management of all Russian operations delegated to the executives of JSC Polymetal, and management of Polymetal International resigning from their positions in the Russian entities. At the same time, all service agreements between the Company and its non-Russian subsidiaries, and JSC Polymetal and its subsidiaries, were terminated and all payments from the Company and its non-designated subsidiaries under other inter-Group agreements with JSC Polymetal and its subsidiaries were discontinued.
The Special Committee, after a thorough review, also recommended the divestment of the Group’s Russian assets as the most viable option for mitigating the legal, financial and operational risks that emerged as a result of designation, and also the optimal path towards re-establishing shareholder value. It became the Company’s way to restore the access to international financial markets, enable the resumption of dividend payments and eliminate the discounts being applied by international capital markets to businesses associated with Russia. With this divestment completed in March 2024, Polymetal’s Board and management team will now be able to concentrate on expanding its asset base within Kazakhstan and also looking to other countries in Central Asia, which present a number of interesting options for further growth.

Dividend decision
Both the re-domiciliation and divestment of the Russian business, along with related de-leveraging, have improved the balance sheet of the Company considerably. However, it will need to invest in excess of $1 billion over the medium term in projects in Kazakhstan, most notably the new Ertis POX, and M&A activities in order to achieve its ambitious long-term growth plans.
As yet, the Company has not restored its access to major sources of debt funding and, in the light of this, the Board considers that it would not be prudent to pay dividends for the full year 2023. This will allow the Group to maintain both strategic and operating flexibility. The Board will further consider the dividend, as described in Dividends and disposal section above.

Change of a major shareholder
I want to express my gratitude to all our shareholders and investors for the continued support that they have shown us over the years. We also welcome our new significant shareholder Maaden International Investment, representing the government of Sultanate of Oman.
We are pleased that the shareholders have confirmed their full support of Polymetal’s strategy and the actions undertaken to secure the future of this business to date as well the intention to further develop the asset base in Kazakhstan and the wider region.

Brighter future
Now that the Company has significantly de-risked its operations and finances, and established stable operations in Kazakhstan, the favourable macroeconomic conditions will allow it to generate sufficient cash flows to fund growth and repay debt. With divestment now complete, we also expect better stock trading conditions for Western shareholders as infrastructure providers gradually remove the limitations previously placed on Polymetal’s shares. The Board is also set on maintaining high standards of corporate governance and ESG in the new environment, which will ensure the creation of further sustainable value.


Senior Independent Non-Executive Director
Evgueni Konovalenko

GROUP CEO STATEMENT
We started 2023 facing many of the frustrations of the previous year: namely, the ongoing Russia/Ukraine war with the resulting upheavals of sanctions and counter-sanctions, and disruptions in supply chains and financing options. With this in mind, from the outset, we planned to pursue re-domiciliation to a “friendly” jurisdiction with a view to also engineer a subsequent split of the business in order to restore shareholder value. However, due to geopolitical interventions beyond our control, this reorganisation did not go as we had originally planned.

Key corporate events in 2023
For a number of reasons, we quickly identified Astana International Financial Centre (AIFC) as the optimal re-domiciliation jurisdiction: because of its basis on English common law, our long-standing presence and listing in Kazakhstan, and its neutral position from the point of western and Russian counter-sanctions. For Astana International Exchange (AIX) to become our primary exchange, however, we also had to accept the hard reality that this would necessitate discontinuing our 12-year premium listing on the London Stock Exchange. And, this in turn, would entail management resolving a separate, complicated set of infrastructural issues in order to enable trading for all categories of shareholder post re-domiciliation.
As we progressed our plans for re-domiciliation to AIFC, the Group was hit by the designation of its Russian business, JSC Polymetal, by the US Department of State, which made any plans to spin off the Russian operation totally impracticable. As a consequence and in response to the US designation, the Board formed a Special Committee to develop appropriate measures with regards to sanctions compliance and to oversee the full divestment of the Russian business – JSC Polymetal and its subsidiaries.
Since then, we have made substantial progress in redefining Polymetal’s status for the long term. In August 2023 the Company successfully completed re-domiciliation to AIFC and resumed trading on AIX as a Kazakh issuer. This also kicked off the process of searching for potential buyers for the Russian business and culminated in the announcement of its disposal at a total effective valuation of US$ 3.7 billion on 19 February 2024. The deal successfully closed on 7 March 2024.
Seen from a purely financial perspective, due to the inevitable Russian discount, the transaction has not generated a great deal of value for Polymetal. Nevertheless, in removing numerous operational, financial, legal and sanctions risks, I truly believe that it is in the best interest of all our shareholders since it enables the Company to open a new chapter in its corporate history. Polymetal is now well-positioned to implement a new strategy and restore its track record of creating sustained shareholder value.

Production and performance
In 2023, the Company avoided major operational business disruption and successfully met its original production guidance. The Company’s gold equivalent production demonstrated solid results, despite the difficult environment experienced by the Russian part of the business and some repercussions from the designation of JSC Polymetal for the Company on the Kazakhstan side.
In spite of persistent geopolitical headwinds, Polymetal retained its profitability and reduced its leverage. An improvement in financial results was driven by robust production and stable cost performance coupled with favourable commodity price dynamics, with revenue increasing by 8% year-on-year to US$ 3 billion. We also reported an impressive 43% increase in EBITDA at US$ 1.5 billion, thanks to both growth in ounces sold through release of working capital and in the devaluation of the local currency in Russia.
Total cash costs (TCC) were 8% lower and all-in sustaining costs (AISC) were 5% lower than in 2022. Both were below the announced guidance range of US$ 950-1,000/GE oz and US$ 1,300-1,400/GE oz, respectively, attributing to the substantial positive impact of Rouble devaluation on local-currency costs. Net debt was largely stable year-on-year at US$ 2.38 billion (US$ 0.17 billion in Kazakhstan and US$ 2.21 billion in Russia) however it decreased in relative terms from 2.35 ND/EBITDA in 2022 to 1.64 in 2023.

Safety remains our top priority
We remain committed to ensuring a safe working environment for all our employees and contractors. Significantly, for the fourth consecutive year, there were no fatal accidents during 2023 among Polymetal’s workforce and nor, for the second year running, among our contractors. I am also pleased to report that none of the ten lost-time accidents (in Russia) resulted in permanent disability or serious damage to health. Employees’ lost-time injury frequency rate (LTIFR) decreased by 30% year-on-year and is a testament to our investment in promoting a zero-harm safety culture.
Our new POX development project in Kazakhstan
Our major development focus now is on Kazakhstan’s first large-scale full-cycle pressure oxidation (POX) plant for refractory ore processing: the Ertis POX project. This will be a new, state-of-the-art facility in the Pavlodar region and will ensure that Kyzyl (and potentially other Kazakh assets) will no longer have to rely on the temporary POX processing arrangement made with Amursk POX in Russia.
We have already identified the site and signed contracts for this and the critical processing equipment. We plan to start construction early next year with completion due by 2028. We are partnering once again with international engineering consultancy, Hatch, who are tasked with both basic and detailed engineering for the project. We are also proceeding with the permitting process. Capitalising on our experience in developing POX sites in Russia, we believe that this project will involve fewer construction risks. Compared with the Russian Far East, the logistics in Kazakhstan are much better as is the cost of materials and labour.

Our next steps
With the sale of Russian assets completed in Q1 2024, the Company is now able to pursue its future growth plans while, at the same time, ensuring the long-term free cash flow potential of the existing assets in Kazakhstan. We expect stable operational results in Kazakhstan in 2024 and, following a positive investment decision from the Board, expected in H2 2024, will accelerate the construction schedule for the Ertis POX.
Our priorities during the year will be centered on safety, cost control and operational improvement. Alongside this, we also plan to make tangible progress in terms of securing new growth opportunities for the business. Together, these will ensure that we deliver substantial financial returns for our shareholders over the coming years. 
We could not have achieved the continued operation of the business over the last year without the loyal support of our employees and I would like to formally thank them on behalf of the whole senior management team. Their skills, expertise and commitment are vital to Polymetal’s future.

Group Chief Executive Officer
Vitaly Nesis

OPERATING REVIEW
Robust production
In 2023, operations continued undisrupted despite the difficulties caused by the imposition of US sanctions against JSC Polymetal and its subsidiaries. The Company’s gold equivalent (GE) production for the year was stable at 1,714 Koz, comprising 486 Koz in Kazakhstan and 1,228 Koz in Russia, and in line with the original production guidance of 1.7 Moz. Kazakhstan’s GE production declined by 10%, mostly driven by a planned grade decline and lower share of high-grade third-party feed at the flotation circuit at Varvara. Russian GE production grew by 4% to 1,228 Koz, in line with the original production plan.
Gold production for the full year was up 3% to 1,492 Koz, while silver output decreased by 15% to 17.7 Moz. Gold sales of 1,400 Koz increased marginally year-on-year, while silver sales decreased by 10% to 16.6 Moz. The gap between production and sales is considered a temporary one: significant tightening of concentrate exports regulations in Russia led to material accumulation in seaports for concentrates in transit. Management is working to resolve this issue in 2024.
Kyzyl continues as the largest individual contributor to the Group’s overall output: full-year gold production came in at 316 Koz. Varvara GE output decreased by 20% to 169 Koz, driven by a decrease in Komar ore grade at the leaching circuit and a lower share of high-grade third-party feed at the flotation circuit. In total, Kazakh operations delivered 486 GE Koz, which accounts for 28% of the Group’s production.
The Company has successfully secured a land plot for the Ertis POX project in the Special Economic Zone near Pavlodar. Evaluation of the site conditions and logistics planning have begun in preparation for delivery of the autoclave. Additionally, the Company has once again selected Hatch for basic and detailed engineering, as well as procurement support. Hatch has an exceptional track record of working with Polymetal on several other projects. Base engineering is already in-progress, enabling accelerated commencement of construction. The investment decision is expected to be made by the Board in the second half of 2024, with the start-up by the end of 2028.
Reserves and resources
In 2023, Group Ore Reserves increased by 2% year-on-year to 28.0 Moz of GE, while the average grade in Ore Reserves decreased by 5% year-on-year and stood at 3.5 g/t of GE.
Ore Reserves in Kazakhstan increased by 3% year-on-year to 11.6 Moz of GE on the back of the revised estimate for underground mining at Kyzyl and positive exploration results (an increase by 249 Koz). The average grade in Ore Reserves in Kazakhstan was 3.2 g/t of GE, a 2% decrease year-on-year driven by a 4% grade decline at Varvara, which was partially offset by positive grade revaluation at Kyzyl.
Share of Ore Reserves for open-pit mining in Kazakhstan decreased by 4% compared to the previous year and stood at 45% on the back of underground reserves extension at Kyzyl.
Group’s Mineral Resources (additional to Ore Reserves) grew by 3% year-on-year to 26.7 Moz of GE. The average GE grade in Mineral Resources was down 7% year-on-year to 4.2 g/t. Mineral Resources in Kazakhstan increased by 26%, while the average GE grade increased by 8% to 2.9 g/t, mainly driven by the MR grade appreciation at Kyzyl by 13%, from 4.1 to 4.6 g/t of GE.
Ore Reserves reconciliation, GE Moz
Ore Reserves, as at 1 January 2023DepletionRevaluationInitial Ore Reserves estimateChange in ownershipOre Reserves, as at 1 January 2024
Kazakhstan11.3-0.5+0.9--11.6
Russia16.0-1.6+1.7+0.5-0.216.4
Total Group27.3-2.1+2.5+0.5-0.228.0
In 2023, exploration activities in Kazakhstan were carried out at 11 licensed and contract areas. In total, 59.4 km of drilling was completed, a 12% decrease year-on-year.
Ore Reserves and Mineral Resources summary
1 Jan 20241 Jan 2023Change

Ore Reserves (Proved+Probable), GE Moz28.027.3+2%
Gold, Moz25.424.7+3%
Silver, Moz210.0211.3-1%
Average reserve grade, g/t 3.53.6-5%

Mineral Resources
(Measured+Indicated+Inferred), GE Moz26.725.8+3%
Gold, Moz24.123.1+4%
Silver, Moz209.2212.9-2%
Average resource grade, g/t4.24.5-8%

Ore Reserves and Mineral Resources as at 1 January 2024

Tonnage
MtGrade GE
g/tContent
GE, Moz
Ore Reserves
Proved (Kazakhstan)28.91.71.6
Proved (Russia)45.53.24.7
Probable (Kazakhstan)82.43.810.0
Probable (Russia)95.43.811.6
Proved+Probable (Kazakhstan)111.33.211.6
Proved+Probable (Russia)140.93.616.4
Proved+Probable 252.23.528.0
Mineral Resources
Measured (Kazakhstan)6.50.90.2
Measured (Russia)22.74.02.9
Indicated (Kazakhstan)17.82.51.4
Indicated (Russia)41.94.05.4
Measured+Indicated (Kazakhstan)24.42.11.6
Measured+Indicated (Russia)64.64.08.3
Measured+Indicated 88.93.59.9
Inferred (Kazakhstan)19.33.92.4
Inferred (Russia)89.95.014.3
Measured+Indicated+Inferred (Kazakhstan)43.72.94.0
Measured+Indicated+Inferred (Russia)154.44.622.6
Measured+Indicated+Inferred198.14.226.7


Health and safety
There were no fatal accidents in 2023. However, lost-time incidents still took place among Polymetal’s workforce and contractors. Most were the result of slipping or tripping while walking or being jammed by a rotating mechanism. In 2023, 10 lost-time incidents were recorded among employees and 4 – among contractors. LTIFR for 2023 decreased to 0.07 for employees (0.10 in 2022) and to 0.08 for contractors (0.21 in 2022). Days lost due to work-related injuries for the full year increased by 32% y-o-y to 1,156 (2022: 877).
While the majority of the incidents that took place during the year were classified as minor (8 minor and 2 severe injuries were reported), Polymetal still took responsive measures for each by updating risk maps for relevant facilities, providing additional instructions to employees and encouraging contractors to carry out an investigation if the accident involved a contractor’s worker.

20232022Change
Injuries
Kazakhstan00n/a
Russia1013-23%
Total1013-23%
including
Fatalities
Kazakhstan00n/a
Russia00n/a
Total00n/a
Severe injuries
Kazakhstan00n/a
Russia20+100%
Total20+100%

LTIFR (per 200,000 hours worked)
Kazakhstan00n/a
Russia0.090.12-25%
Total0.070.10-30%

Days off work following accidents
Kazakhstan00n/a
Russia1,156877+32%
Total1,156877+32%

CONTRACTORS
Injuries
Kazakhstan00n/a
Russia412-67%
Total412-67%
including
Fatalities
Kazakhstan00n/a
Russia00n/a
Total00n/a
Severe injuries
Kazakhstan00n/a
Russia00n/a
Total00n/a

LTIFR (per 200,000 hours worked)
Kazakhstan00n/a
Russia0.120.31-61%
Total0.080.21-62%

Employees
Our average headcount in 2023 decreased slightly by 0.3% y-o-y to 14,647 employees, with approximately half working on a fly-in/fly-out basis at remote sites. Our voluntary turnover rate significantly decreased to 4.7% in 2023, compared to 8.4% in 2022. The voluntary staff turnover for assets in Russia was 5.6% while in Kazakhstan it comprised 1.4%.
We continue to observe higher labour market competition and increased demand for mining experts, that is why we offer employees competitive salaries and a range of opportunities for professional development, such as succession planning, mentorship and a Talent Pool programme. In 2023, our Talent Pool consisted of 456 employees prepared to take up leadership positions in the future, 78 of which gained promotion during the year.
The share of women in Polymetal’s workforce remained stable at 21% in 2023. We continue to promote a culture of equal opportunity through training and communications. In order to eliminate workplace bias, empower diverse teams and attract and retain people with different background, we have adopted a Diversity and Inclusion Programme, which includes training and engagement activities, diversity metrics and targets, collaboration with educational institutions and ongoing internal communication. Among other actions, this led to an increase in the proportion of women in leadership positions by 1% to 23% in 2023. Besides managing gender diversity issues, we aim to eliminate discrimination based on age or disability. For example, we have created an interactive online course on inclusion practices. This course provides an informed understanding of disability, highlighting the potential risks of bias at work and has also been incorporated into the induction programme for new employees.
20232022Change
Average headcount
Kazakhstan3,2023,219-0.5%
Russia11,44511,475-0.3%
Total14,64714,694-0.3%

Share of female employees
Kazakhstan20%20%0%
Russia22%22%0%
Total21%21%0%

Share of female managers
Kazakhstan21%22%-5%
Russia23%22%5%
Total23%22%5%

Voluntary turnover
Kazakhstan1.4%4.6%-70%
Russia5.6%9.4%-40%
Total4.7%8.4%-44%
including
For female employees
Kazakhstan2.5%2.9%-14%
Russia5.1%8.2%-38%
Total4.6%7.1%-35%
For male employees
Kazakhstan1.1%5.1%-78%
Russia5.8%9.8%-41%
Total4.7%8.7%-46%
Climate and Energy
Accepting the need to take urgent action to mitigate human-made impacts on climate, we are committed to reducing our own impact and developing an approach to potential carbon neutrality. Our strategy is focused on those projects that comprehensively reduce our GHG emissions and also the net adverse impact on water resources and biodiversity.
In 2023, we adhered to our climate targets of reducing our direct and energy-related emissions, and we are gradually adapting our Climate Action Plan to the new circumstances and potential changes in Group structure. In our Climate Strategy, we give unconditional priority to real decarbonisation projects and state that offsetting is reserved only for hard-to-abate or residual emissions.
Our 2023 direct emissions (Scope 1) decreased by 4% compared to 2022 mainly due to the implementation of energy efficiency measures, while our indirect energy-related emissions (Scope 2) increased due to legislative changes in the energy market of Kazakhstan and the resulting lack of opportunity to purchase green electricity from the grid. Further efforts within the Kazakhstan segment are therefore focused on commissioning in-house solar power plants with a total capacity of up to 40 MW at Varvara and Kyzyl.
We have continued to reforest territories equal to those that had been disturbed by our activities. In 2023, we planted 430 thousand saplings on almost 200 hectares of land in regions where we operate. In addition, as part of our commitment to actively fostering a favourable environment for all stakeholders in our operating regions and taking initial steps towards implementing a Net Positive Impact approach, we are undertaking a voluntary pilot project to plant a new forest not far from Varvara site in Kazakhstan.
20232022Change
ENERGY
Total energy consumed (GJ)
Kazakhstan3,542,1403,471,7192.0%
Russia7,205,5977,285,162-1.1%
Total10,747,73710,756,881-0.1%

Energy intensity (GJ per Koz of GE produced)
Kazakhstan7,2966,417+14%
Russia5,8676,179-5%
Total6,2716,254+0.3%

GREENHOUSE GAS (GHG) EMISSIONS
Scope 1 GHG emissions (CO2 eq. Kt)
Kazakhstan208201+3%
Russia516550-6%
Total724751-4%

Scope 2 GHG emissions (market based, CO2 eq. Kt)
Kazakhstan252216+17%
Russia111115-3%
Total363331+10%

Scope 1 + Scope 2 (CO2 eq. Kt)
Kazakhstan460417+10%
Russia627665-6%
Total1,0871,082+0.5%

GHG intensity of Scope 1 and Scope 2 emissions
(kg of CO2e per oz of GE)
Kazakhstan947771+23%
Russia511564-4%
Total634629+4%

Environment
Our Environmental Management System (EMS) is the cornerstone of our approach. All production sites in Kazakhstan and most of them in Russia are certified to the ISO 14001 global standard. Our EMS is supported by specific systems for cyanide and tailings management, as well as internal and external auditing.
The monitoring of both water quantity and quality is a key focus within our EMS. Given the predicted physical impacts of climate change on our operations, vigilance in monitoring water risks is crucial for our assets in Kazakhstan. We strive to continually enhance our water efficiency by employing metering and auditing practices for water consumption, coupled with the meticulous management of the quality of wastewater. The majority of the water we use in ore processing is circulated in closed water cycles. Overall, 93% of our on-site water consumption is via a closed cycle of treated waste water (compared to 91% in 2022). We remain committed to our ambitious goal of reducing fresh water usage for processing per unit of production by 55% by 2030, compared with the 2019 . In 2023, we decreased our fresh water intensity for ore processing by 53%, compared with 2019, to 125 m³/1,000 t (2022: 49%).
We operate seven TSFs and four dry stacking facilities in Kazakhstan and Russia, and are carrying out technical closure works at two TSFs. Wherever possible, we have implemented dry cake stacking in order to eliminate affecting both ground and surface water, as well as the surrounding area, and we currently store 70% in dams and 30% as dry cake.
20232022Change
WATER
Fresh water withdrawn (th. m3)
Kazakhstan1,2731,290-1%
Russia2,0102,054-2%
Total3,2833,344-2%

Water reused and recycled (th. m3)
Kazakhstan11,56911,089+4%
Russia34,32923,353+47%
Total45,89834,442+33%
Total water used (th. m3)
Kazakhstan12,84212,378+4%
Russia36,33825,408+43%
Total49,18137,786+30%

Share of water recycled and reused
Kazakhstan90%90%+1%
Russia94%92%+3%
Total93%91%+2%

Fresh water use for processing intensity
(m3/ Kt of processed ore)
Kazakhstan178188-5%
Russia99112-12%
Total125138-9%

WASTE
Share of waste recycled (including overburden)
Kazakhstan8%10%-20%
Russia33%42%-21%
Total17%23%-26%

Share of dry stacking in tailings disposal
Kazakhstan--n/a
Russia30%28%+7%
Total30%28%+7%

Communities
We aim to maintain open dialogue with neighboring communities, ensuring transparent feedback mechanisms in all regions where we operate. In 2023, we responded to all of the 780 enquiries received from locals, surveyed 1,174 community representatives and held 90 stakeholder engagement events. The outcomes of such engagement inform our social investment programmes. Polymetal’s social investments amounted to US$ 17.6 million in 2023 (including US$ 7.3 million in Kazakhstan) and were targeted to projects in education, local infrastructure, sports, culture and Indigenous Minorities of the North support (compared to US$ 23 million in 2022). No cases of human rights violations connected to Polymetal’s employees or contractors were reported in 2023.
20232022Change
Total community investment (US$ million)
Kazakhstan7.38.8-17%
Russia10.314.4-28%
Total17.623.2-24%

Enquiries from communities received and responded to
Kazakhstan335223+50%
Russia445616-28%
Total780839-7%

Stakeholder meetings and events
Kazakhstan2122-5%
Russia6958+19%
Total9080+13%

Number of respondents to community polls
Kazakhstan79100-21%
Russia1,0951100-0.5%
Total1,1741,200-2%

2024 outlook for Kazakhstan business
Safety remains a top priority for Polymetal. We will continue to focus on further improvements in health and safety metrics and maintaining zero fatalities across our operations and among on-site contractors conducting business on behalf of the Group.
In 2024, we expect stable operational results in Kazakhstan as well as a positive investment decision on the Ertis POX. The Company expects its Kazakhstan assets to deliver stable production at approximately 475 Koz of GE.
We will continue running a number of development projects at existing operations, aimed at either extending the life-of-mine or reducing costs despite the planned depletion of higher-grade ore sources. At Kyzyl, the Company intends to push the throughput further to the 2.6 Mtpa level by the second half of 2024. We are in the process of reducing our reliance on diesel power, and with it our environmental impact, through renewable energy projects. This includes upgrading dump trucks from diesel fuel to gas at Kyzyl and progressing the 40 MWh solar power plant and gas power plant for Varvara and Kyzyl located at Varvara’s operating site.
At the same time, we will focus on advancing our long-term project pipeline. At Ertis POX, we plan to undertake engineering work, order technological equipment and prepare the construction site. The investment decision is expected to be made by the Board in the second half of 2024, with the start-up in 2028.
Polymetal will aim to pursue growth opportunities in Kazakhstan and selected Central Asian countries. We are looking for precious and base metal assets where we can apply our deep competencies in engineering, development and operations.
FINANCIAL REVIEW
MARKET SUMMARY
Precious metals
Despite multiyear-high interest rates and bond yields, markets remained disturbed by looming recessionary fears and the ongoing global geopolitical conflicts, which made investors lean towards safe-haven assets such as gold. In H1 2023, along with the peaking interest rates, gold price reached the lowest boundary of US$ 1,811/oz before beating 2022 all-time high and reaching US$ 2,078/oz in H2 2023 on the back of elevated geopolitical and security risks, and indications of rate cuts in 2024. The average LBMA gold price in 2023 was US$ 1,943/oz, an increase of 8% compared to the prior year.
In 2023, gold demand remained strong at 4,448 tonnes, only 5% below the very exceptional 2022, when the world saw post pandemic re-opening and the escalation of the military conflict between Russia and Ukraine. Gold accumulation momentum in the recent years continued into 2023 – over 1,037 tonnes were added to central banks’ reserves, with China purchasing the most, while Kazakhstan being the one the biggest sellers.
Despite an elevated gold price, jewelry demand proved to be strong and maintained on par with 2022 at 2,093 tonnes. The removal of COVID restrictions in 2022 paved the way for 2023 jewelry demand hike in China – the world’s largest jewelry consumer. China’s annual jewelry consumption increased by 10% y-o-y to 630 tonnes, which was partially offset by India’s price sensitivity and as a result volume of gold jewelry purchases.
Third consecutive annual gold ETF outflow along with the weakening demand for bars and coins pulled overall investment demand to 945 tonnes – a 15% y-o-y drop (2022: 1,113 tonnes). In 2023, global soaring inflation, record-high bond yields and waves of liquidity issues within the banking sector attracted investors to a strong US dollar and risk-free government bonds away from the gold investments.
Consequences of the COVID relief stimulus payments by governments has not spared the technology market. Notwithstanding advances in the artificial intelligence, major chip manufacturers experienced downturn, which was reflected in the gold demand. Tech demand for gold dropped by 4% y-o-y to 298 tonnes for the first time sinking below 300 tonnes mark.
Having started the year by largely tracking gold dynamics, the silver price reached annual low of US$ 20.1/oz in March. It did not then, however, see the same dramatic upturn as gold. Investors preferred to stick to the more superior safe-haven gold. Even though silver briefly rallied to US$ 26.0/oz in April on the back of the geopolitical tension and economic uncertainty, it failed to maintain the momentum and averaged at US$ 23.3/oz for the year, up 7% (2022: US$ 21.8/oz).
Foreign exchange
The Group’s revenue and over 72% of borrowings are denoted in US Dollars and Renminbi, while the majority of the Group’s operational costs are denoted in Russian Rouble and Kazakh Tenge. As a result, changes in exchange rates affected the Company’s financial results and performance.
The Russian Rouble demonstrated significant devaluation relative to 2022. Continuous geopolitical escalation, capital outflows and a US$ 169.4 billion decrease in exports, as a result of deteriorating oil prices pulled the Rouble rate to a high level of 101 RUB/US$ in August of 2023. Towards the year-end, the Rouble somewhat improved to 89.7 RUB/USD on the back of the emergency 350bps rate hike by the Central Bank of Russia and re-introduction of capital control measures, including variable export duties and mandatory sales of foreign currency revenues. The average annual Rouble rate was 85.3 RUB/US$ (2022: 68.6 RUB/US$).
Although, consistent geopolitical tension within the CIS region, global strengthening of the USD as well as a weakening average oil price of US$ 82 per barrel (2022: US$ 101 per barrel) posed significant pressures, the Kazakhstani tenge remained steady at 456 KZT/US$ (2022: 461 KZT/US$) throughout 2023. This has been driven by increased oil exports, and significant sales of foreign currency and gold reserves by the National Bank of Kazakhstan.

REVENUE
SALES VOLUMES20232022Change

Gold, Koz1,4001,376+2%
Silver, Moz16.618.5-10%
Gold equivalent sold , Koz1,6081,622-1%


Sales by metal
(US$m unless otherwise stated)20232022ChangeVolume variance, US$mPrice variance, US$m
Gold2,6402,392+10%41206
Average realised price US$ /oz1,9291,764+9%
Average LBMA priceUS$ /oz1,9431,802+8%
Share of revenues 87% 85%
Silver 363383-5%(40)20
Average realised priceUS$ /oz22.821.9+4%
Average LBMA priceUS$ /oz23.421.8+8%
Share of revenues12%14%
Other metals2226-15%
Share of revenues1%1%
Total revenue3,0252,801+8%(13) 237
In 2023, revenue grew by 8% y-o-y driven by the growth of gold and silver average realised prices. Gold sales increased marginally by 2% y-o-y. Silver sales decreased by 10% due to significant tightening of concentrate exports regulations in Russia, which led to material accumulation in sea ports of concentrates from Russian assets.
The Group’s average realised gold price was US$ 1,929/oz in 2023, up 9% from US$ 1,764/oz in 2022, slightly below the average market price of US$ 1,943/oz. The Group’s average realised silver price was US$ 22.8/oz, higher by 4% y-o-y, but 3% below the average market price of US$ 23.4/oz since two-thirds of annual sales were skewed towards the first half of 2023 with weaker average prices.
The share of gold sales as a percentage of total revenue increased from 85% in 2022 to 87% in 2023, driven by a corresponding shift in production and sales volume by metal.

Revenue, US$mGold equivalent sold, Koz
OPERATION20232022Сhange20232022Сhange

Kazakhstan893933-4%459533-14%
Kyzyl518554-7%271322-16%
Varvara365379-4%188212-11%
Other 10-n/a--n/a

Russia2,1321,868+14%1,1441,089+5%
Total revenue3,0252,801+8%1,6031,622-1%
The decrease in sales volumes during the period had a negative impact on revenues at all operating mines in Kazakhstan, which was partially offset by higher commodity prices. Difficulties with inventory conversion into sales were particularly pronounced with concentrates going through Russian Far Eastern ports, including Kyzyl concentrate being sold to China. Management will continue to work to resolve this issue during the first half of 2024, particularly focusing on Kyzyl.
At Varvara, sales volumes broadly followed production volumes, which decreased as a result of planned grade decline.
COST OF SALES

(US$m)20232022Change


Cash operating costs1,4541,513-4%
On-mine costs632741-15%
Smelting costs532567-6%
Purchase of metal inventories from third parties12769+84%
Mining tax163136+20%


Costs of production1,7341,836-6%
Depreciation and depletion of operating assets280324-14%
Rehabilitation expenses - (1) n/a

Total change in metal inventories(282)(152)+86%
Increase in metal inventories(276)(216)+28%
(Reversal)/Write-down of inventories to net realisable value(6)64n/a

Idle capacities and abnormal production costs76+17%
Total cost of sales1,4591,690-14%


CASH OPERATING COST STRUCTURE20232022
US$mShareUS$mShare

Services49034%57638%
Consumables and spare parts40628%43829%
Labour25718%28519%
Mining tax16311%1369%
Purchase of metal inventories from third parties1279%695%
Other expenses111%91%
Total cash operating cost1,454100%1,513100%
The total cost of sales decreased by 14% in 2023 to US$ 1,459 million, reflecting the positive impact of the Russian Rouble depreciating by 24%. The devaluation impact from Russian operations offset domestic inflation (9% y-o-y in Kazakhstan and 7% y-o-y in Russia) and increase in mining tax.
The cost of services and of consumables and spare parts were down 15% and 7% y-o-y, caused mostly by a weaker Rouble compared with 2022.
The cost of labour within cash operating costs was US$ 257 million, a 10% decrease over 2022, mainly stemming from local currency devaluations, which outweighed the annual salary increases (tracking domestic CPI inflation).
Mining tax increased by 20% y-o-y to US$ 163 million, mainly driven by an increase in average realised prices, as well as gold mining tax rates in Kazakhstan increasing from 5% to 7.5%.
The increase in purchases of third-party metal inventories by 84% was mostly driven by larger volumes of high-grade third-party ore processed at the Varvara flotation circuit.
Depreciation and depletion was US$ 280 million, down 14% y-o-y, largely driven by the positive effect of a weaker Rouble. US$ 26 million of depreciation cost are included within the total increase in metal inventories (2022: US$ 52 million).
In 2023, a net metal inventory increase of US$ 276 million (2022: US$ 216 million) was recorded. The increase was mainly represented by concentrate build-up at Russian assets, due to the tightening of concentrate exports regulations in Russia. The Company expects the bulk of this increase to be reversed during the course of 2024, particularly at Kyzyl.
The Group recognised a US$ 6 million reversal (2022: US$ 65 million write-down) to the net realisable value of heap leach ore at Russian mines (see Note 17 of the condensed consolidated financial statements).
GENERAL, ADMINISTRATIVE AND SELLING EXPENSES
(US$m)20232022Сhange

Labour215243-11%
Services1915+27%
Share-based compensation1113-15%
Depreciation710-30%
Other 2230-27%
Total general, administrative and selling expenses274311-12%
General, administrative and selling expenses (“SGA”) decreased by 12% y-o-y from US$ 311 million in 2022 to US$ 274 million in 2023, mainly reflecting a decrease in staff costs in US Dollar terms driven by devaluation of the Rouble.
OTHER OPERATING EXPENSES
(US$m)20232022Change

Exploration expenses3562-44%
Social payments3444-23%
Bad debt allowance19(1)n/a
Provision for investment in Special Economic Zones1514+7%
Taxes, other than income tax1415-7%
Additional tax charges/fines/penalties-2n/a
Change in estimate of environmental obligations(7)(2)n/a
Other expenses77n/a
Total other operating expenses117142-18%
Other operating expenses decreased to US$ 117 million in 2023 (2022: US$ 142 million) mainly due to the reduction in exploration costs and a scheduled decrease in social payments in accordance with existing partnership agreements.
TOTAL CASH COSTS
In 2023, total cash costs per gold equivalent ounce sold were US$ 861/GE oz, down 8% y-o-y. The depreciation of the Russian Rouble against the US Dollar outweighed inflationary pressures and planned grade decline.
The table below summarises major factors that have affected the Group’s TCC and AISC dynamics y-o-y:
RECONCILIATION OF TCC AND AISC MOVEMENTS TCC, US$/ozChangeAISC, US$/ozChange
Cost per AuEq ounce 20229421,344
RUB and KZT rate change(156)-17%(209)-16%
Domestic inflation66+7%93+7%
Change in average grade processed22+2%22+2%
Sustaining capex increase-n/a41+3%
Other(13)-1%(16)-1%
Cost per AuEq ounce 2023861-8%1,276-5%

Total cash cost by segment/operation, US$/GE oz
Cash cost per GE ounce, US$/GE ozGold equivalent sold, Koz
OPERATION20232022Change20232022Change

Kazakhstan 903 728 +24%459533-14%
Kyzyl 704 602 +17%271322-16%
Varvara 1,189 920 +29%188212-11%

Russia 845 1,046-19%1,1441,089+5%
Total Group TCC 861 942-9%1,6031,622-1%
Kazakhstan
Kyzyl’s total cash costs were at US$ 704/GE oz, significantly below the Group’s average level, albeit up 17% y-o-y, because of a planned gradual grade decline towards the open-pit reserve average (8% decrease in 2023) and an 16% decrease in sales volumes.
At Varvara, TCC were at US$ 1,189/GE oz, up by 29% year-on-year, on the back of a planned grade decline of 13%, combined with a 11% decrease in sales volumes and inflationary headwinds.
Russia
Across the Group’s Russian mines, TCC were at US$ 845/GE oz, down by 19% year-on-year, mainly on the back of Rouble depreciation.
Analysis of 2H 2023 versus 1H 2023 performance:
Total cash costs per GE oz
Cash cost per GE oz, US$ /ozGold equivalent sold, Koz
OPERATION2H 20231H 2023Change2H 20231H 2023Change

Kazakhstan928871+7%253206+22%
Kyzyl743649+14%158113+40%
Varvara1,2391,138+9%9593+1%

Russia 746 975-24%650494+32%
Total Group TCC 797 944-16%903 700+29%
In 2H 2023, TCC were 16% lower compared to 1H 2023 at US$ 797/GE oz, driven by the increase in sales volumes combined with local currency depreciation.
Kazakhstan
At Kyzyl, total cash costs in 2H 2023 were at US$ 743/GE oz, up 14% half-on-half, as material work-in-progress was accumulated in 2H 2023 to be released in 2024.
At Varvara, TCC increased by 9% compared to 1H 2023 to US$ 1,239/GE oz on the back of planned gradual grade declines.
Russia
Across the Group’s Russian mines, TCC were at US$ 746/GE oz, decreasing by 24% half-on-half, mostly driven by 32% increase in sales volumes further supported by 21% Rouble depreciation, with an average rate of 93 RUB/USD in 2H 2023 compared to 77 RUB/USD in 1H 2023.

ALL-IN SUSTAINING AND ALL-IN CASH COSTS
All-in sustaining cash costs amounted to US$ 1,276/GE oz, down 5% y-o-y, broadly in line with TCC dynamics, reflecting the decrease in capitalised stripping on the back of completed stripping campaigns at Dukat.
AISC by operations were as follows:
All-in sustaining cash costs by segment/operation, US$/GE oz
OPERATION20232022Change

Kazakhstan 1,263 1,067 +18%
Kyzyl 920 852 +8%
Varvara 1,592 1,144+39%

Russia 1,281 1,4801-13%
Total Group AISC 1,276 1,344-5%
AISC at all operating mines generally followed TCC dynamics.
In Kazakhstan, AISC increased by 18% to US$ 1,263/oz, which was mostly driven by the decrease in sales volume, resulting in the spread of sizeable sustaining capital expenditure (including investments in new tailing storage facilities at Varvara) over a limited amount of ounces sold.
In Russia, AISC decreased by 13% to US$ 1,281/oz, on the back of sales increase, coupled with lower stripping volumes after completion of large stripping campaigns in 2023.
Total, US$mUS$ /GE oz
RECONCILIATION OF
ALL-IN COSTS20232022Change20232022Change

Cost of sales, excluding depreciation, depletion and write-down of inventory to net realisable value (Note 4 of financial statements)1,2121,355-11%754837-10%
Adjusted for:
Corporate expenses(10)0n/a(5)n/a
Idle capacities (7) (6)+14% (4) (4)0%
Treatment charges deductions reclassification to cost of sales 77 60 +28% 48 37 +30%
SGA expenses, excluding depreciation, amortization and share-based compensation (Note 4 of financial statements)116 133 -13% 72 82 -12%
Adjusted for:
SGA expenses of development projects (7) (16)-57% (4) (10)-60%
Total cash costs 1,381 1,528 -10% 861 942 -9%
Corporate SGA expenses and other operating expenses 225 271 -17% 140 167 -16%
Capital expenditure excluding development projects 365 275 +33% 228 170 +34%
Exploration expenditure (capitalised)1015-37% 6 9-33%
Capitalised stripping6592-30% 40 57-30%
All-in sustaining cash costs 2,045 2,181-6%1,2761,344-5%
Finance costs (net) 135 111+22% 84 68+24%
Capitalised interest 49 35 +38% 30 22+36%
Income tax paid 216 234 -8% 135 144 -6%
After-tax all-in cash costs 2,445 2,562 -5% 1,526 1,579 -3%
Capital expenditure for development projects 241 422 -44% 150 260-42%
SGA and other expenses for development assets 20 40 -51% 12 25 -52%
All-in costs 2,705 3,024 -11% 1,688 1,865-9%

ADJUSTED EBITDA AND EBITDA MARGIN
(US$m)
20232022Change

Profit/(loss) for the year 528 (288) n/a
Finance cost (net) 135 111 +22%
Income tax expense/(benefit) 315 (44) n/a
Depreciation and depletion 261 282 -7%
EBITDA 1,239 61 n/a

Net foreign exchange loss 174 32n/a
Impairment of non-current assets, net 126825n/a
(Gain)/loss on disposal of subsidiaries, net (113) 2n/a
Share-based compensation 11 13 -15%
Change in fair value of contingent consideration liability 8 20 n/a
Other non-cash items 13 65n/a
Adjusted EBITDA 1,458 1,017 +43%
Adjusted EBITDA margin 48%36%+12%
Adjusted EBITDA per GE oz907628+44%
Adjusted EBITDA by segment/operation
(US$m)

OPERATION20232022Change

Kazakhstan439516-15%
Kyzyl332361 -8%
Varvara137177 -22%
Attributable corporate and other costs(30)(22)+36%

Russia1,019501+103%
Total Group Adjusted EBITDA1,4581,017+43%
In 2023, Adjusted EBITDA increased by 43% y-o-y to US$ 1,458 million, with an Adjusted EBITDA margin of 48% (2022: 36%), driven by the cost dynamics described above combined with a 9% increase in the gold average realised price.
OTHER INCOME STATEMENT ITEMS
Polymetal recorded a net foreign exchange loss in 2023 of US$ 174 million compared with an exchange loss of US$ 32 million in 2022, mostly attributable to the revaluation of the US Dollar-denominated borrowings of Russian operating companies, the functional currency of which is the Russian Rouble. This was partially offset by a foreign exchange loss on intercompany loans with different functional currencies in lending and borrowing subsidiaries.
The Group does not use any hedging instruments for managing foreign exchange risk, other than a natural hedge arising from the fact that the majority of the Group’s revenue is denominated or calculated in US Dollars.
In 2023 the Group recognised an impairment charge of US$ 165 million in respect to Amursk POX due to continued use of Amursk POX processing facility to treat Kyzyl refractory concentrate on the terms of a new tolling agreement, as entailed by provisions of JSC Polymetal divestment. See Note 14 to the condensed consolidated financial statements.
Income tax expense for 2023 was US$ 315 million compared to US$ 44 million benefit in 2022. For details refer to Note 13 of the condensed consolidated financial statements.
NET EARNINGS, EARNINGS PER SHARE AND DIVIDENDS
The Group recorded a net profit of US$ 528 million in 2023, compared to loss of US$ 288 million in 2022 which was largely driven by impairment charges.
In September 2023, the Group effectively disposed of 50.1% stake in Amikan and recognised a gain on disposal of US$ 113 million. See Note 3 to the condensed consolidated financial statements.
The underlying net earnings attributable to shareholders of the parent company were US$ 615 million, compared with US$ 440 million in 2022:
Reconciliation of underlying net earnings
(US$m)
20232022Change

Profit/(loss) for the financial period attributable to shareholders of the parent company 528 (288) n/a
(Reversal)/write-down of inventory to net realisable value (6) 64 n/a
Foreign exchange loss 174 32+444%
Change in fair value of contingent consideration liability 8 20 -60%
(Gain)/loss on disposal of subsidiaries, net (113) 2n/a
Impairment of non-current assets, net 126 825n/a
Tax effect (103) (216)-52%
Underlying net earnings 615440+44%
Basic profit per share was US$ 1.11 compared to US$ 0.61 loss per share in 2022. Underlying basic EPS was US$ 1.30, compared with US$ 0.93 in 2022.

CAPITAL EXPENDITURE
(US$m)SustainingDevelopmentCapital stripping and underground developmentExplorationTotal
2023Total
2022

Development projects-241-1242249
Kazakhstan-23-124-
Ertis POX-23--23-
Other---11-
Russia-218-1218249

Operating assets365-659438543
Kazakhstan79-42-121102
Varvara55-13-6839
Kyzyl24-29-5362
Russia286-239319442
Total capital expenditure3652416510679794
In 2023, total capital expenditure was US$ 679 million , down 14% y-o-y, and 3% below the lower end of the guidance range of US$ 700-750 million, because of the substantial positive impact of the Russian Rouble devaluation on local-currency costs. Capital expenditure excluding capitalised stripping costs was US$ 614 million in 2023 (2022: US$ 679 million).
The major capital expenditure items in 2023 were as follows:
Development projects
In Kazakhstan, capital expenditure of US$ 23 million was related to initial investments for the Ertis POX facility which is being developed in order to fully sever the link between the Company's subsidiaries in Kazakhstan and its blocked subsidiaries in the Russian Federation. A land plot in the Pavlodar Special Economic Zone was successfully secured.
Capital expenditure at development projects of US$ 218 million in Russia mainly covered Amursk POX-2 to ensure project completion according to plan in the second half of 2024, as well as mining fleet purchases, spare parts and consumables purchases at Veduga.
Stay-in-business capex at operating assets
At Varvara, capital expenditure of US$ 55 million was mainly related to the construction of a tailings storage facility and upgrading the mining fleet.
At Kyzyl, capital expenditure in 2023 comprised US$ 24 million, mainly represented by scheduled technical upgrades and expansion of the concentrator capacity to 2.4 Mtpa.
Across the Group’s Russian mines, capital expenditure of US$ 286 million was mostly related to infrastructure upgrades, regular mining fleet replacements and maintenance capital expenditure at processing facilities.
Exploration and stripping
The Group continues to invest in standalone exploration projects. Capital expenditure for exploration in 2023 was US$ 10 million (2022: US$ 17 million).
Capitalised stripping and underground development costs totalled US$ 65 million in 2023 (2022: US$ 115 million) and are attributable to operations with 2023 stripping ratios exceeding their life-of-mine averages during the period, particularly Kyzyl (US$ 29 million), Varvara (US$ 13 million) and Russian mines (US$ 23 million).

CASH FLOWS
(US$m)20232022Change

Operating cash flows before changes in working capital1,074679+58%
Changes in working capital(499)(473)+5%
Total operating cash flows575206+179%

Capital expenditure(679)(794)-14%
Net cash (outflow)/inflow on M&A(3)123n/a
Other(24)(8)n/a
Investing cash flows(706)(679)+4%

Financing cash flows
Net changes in borrowings380838-55%
Repayments of principal under lease liabilities(21)-n/a
Acquisition of non-controlling interest-(24)n/a
Contingent consideration paid-(27)n/a
Total financing cash flows359787-54%

Net increase in cash and cash equivalents228314-27%
Cash and cash equivalents at the beginning of the year633417+52%
Effect of foreign exchange rate changes on cash and cash equivalents(19)(98)n/a
Cash and cash equivalents at the end of the year842633+33%
Total operating cash flows in 2023 strengthened y-o-y. Operating cash flows before changes in working capital grew by 58% y-o-y to US$ 1,074 million, as a result of an increase in adjusted EBITDA. Net operating cash flows were US$ 575 million, compared with US$ 206 million in 2022, affected by an increase in working capital of US$ 499 million (2022: US$ 473 million).
Total cash and cash equivalents increased by 33% compared with 2022 and comprised US$ 842 million, with the following items affecting the cash position of the Group:
Operating cash flows of US$ 575 million;
Investment cash outflows totalling US$ 706 million, up 4% year-on-year, mainly represented by capital expenditure (down 14% y-o-y to US$ 679 million) and cash flows on acquisitions and disposals (US$ 3 million);
The gross borrowings increase of US$ 380 million, mostly driven by financing of the Group’s short-term working capital requirements; and
Repayments of principal under lease liabilities of US$ 21 million.


BALANCE SHEET, LIQUIDITY AND FUNDING
NET DEBTAs at
31 December
2023As at
31 December
2022Change


Total Net debt2,3832,393-0%
Total Net debt / Adjusted EBITDA1.642.35-44%

Kazakhstan
Short-term debt and current portion of long-term debt14576+91%
Long-term debt356719-50%
Gross debt503795-37%
Less: cash and cash equivalents329518-36%
Net debt174277-37%
Net debt / Adjusted EBITDA0.39x0.54x-38%

Russia
Short-term debt and current portion of long-term debt860439+96%
Long-term debt1,8641,797+4%
Gross debt2,7242,236+22%
Less: cash and cash equivalents514119n/a
Net debt2,2092,117+4%
Net debt / Adjusted EBITDA2.17x4.23x-95%
The Group’s net debt decreased to US$ 2,383 million as of 31 December 2023, representing a Net debt/Adjusted EBITDA ratio of 1.64x, significantly below the 2022 leverage ratio of 2.35x.
The proportion of long-term borrowings of total borrowings was 69% as at 31 December 2023 (83% as at 31 December 2022). As at 31 December 2023, the Group had US$ 1.4 billion (31 December 2022: US$ 0.35 billion) of available undrawn facilities, from a wide range of lenders, which allows the Group to maintain its operational flexibility in the current environment.
Gross debt increased by 7% to $3,225 million, of which 73% is denominated in hard currency. Kazakhstan represents 16% of the total debt outstanding, while Russia represents the remaining 84% of the debt.
The average cost of debt increased to 8.3% in 2023 (2022: 5.08%). In Kazakhstan, average interest rates remained low at 3.95%, while for Russian subsidiaries it reached 9.1% as re-financing was available mostly in Roubles or in Renminbi at elevated interest rates.
77% of available cash balances of US$ 842 million is denominated in hard currency. The Group is confident in its ability to repay its existing borrowings as they fall due.

INVENTORIES
Inventory levels increased by US$ 104 million to US$ 1,294 million for 2023. US$ 274 million of inventory balance relates to Kazakhstan, and US$ 1,020 million of inventory comes from Russia.
This increase of US$ 95 million for the second half of 2023 relates mostly to accumulation in sea ports of concentrates from Russian assets.

(US$m)31 Dec 2023Change30 Jun 2023Change31 Dec 2022

Kazakhstan274+8267+77 190
Сopper, gold and silver concentrate66+759+2039
Ore stock piles86+086+1471
Doré, work in-process, metal for refining and refined metals
51
-354+2629
Non-metal inventories71+368+1651

Russia1,020+86934-66 1,000
Сopper, gold and silver concentrate266+15252-6248
Ore stock piles173-19192-55247
Doré, work in-process, metal for refining and refined metals
247
+81167+7170
Non-metal inventories333+10323-12335

Total inventory1,294+951,199+9 1,190

Payable metals in inventory accumulated at 31 December 2023 were as follows:
(GE Koz)KazakhstanRussiaTotal Group

Concentrate and precipitate65206271
Bullions-291291
Doré122335
Total payable metals78519597

2024 OUTLOOK FOR KAZAKHSTAN BUSINESS
The Company expects its Kazakhstan assets to deliver stable production at 475 Koz of GE.
Costs are estimated in the ranges of US$ 900-1,000/GE oz for TCC and US$ 1,250-1,350/GE oz for AISC . A y-o-y increase is expected, largely because of the sharp increases in power and railway tariffs in Kazakhstan.
Capital expenditures are expected to be approximately US$ 225 million, including US$ 60 million for Ertis POX.
The Group currently forecasts positive free cash flow in 2024.
PRINCIPAL RISKS AND UNCERTAINTIES
There are a number of potential risks and uncertainties which could have a material impact on the Group’s performance and could cause actual results to differ materially from expected and historical results.
The principal risks and uncertainties facing the Group are categorised as follows:
Operational risks:
Production risk
Construction and development risk
Supply chain risk
Exploration risk
Sustainability risks:
Health and safety risk
Environmental risk
Human capital risk
Political and social risks:
Legal and compliance risk
Political risk
Taxation risk
Financial risks:
Market risk
Currency risk
Liquidity risk
A detailed explanation of these risks and uncertainties can be found on pages 100 to 109 of the 2022 annual report which is available at www.polymetalinternational.com.
The directors consider that these principal risks and uncertainties have not changed materially since the publication of the annual report for the year ended 31 December 2022 and continue to apply to the Group for the 2023 financial year.
Further updates will be presented in the full annual financial report for 2023.  
GOING CONCERN
In assessing its going concern status, the Group has taken into account principal risks and uncertainties, financial position, sources of cash generation, anticipated future trading performance, borrowings and other available credit facilities, and forecasted compliance with covenants on those borrowings, and capital expenditure commitments and plans.
In the going concern assessment, the Group also considered the implications of sanctions imposed by U.S. Department of State on JSC Polymetal, the Company’s subsidiary in the Russian Federation. In February 2024, the Group entered into contracts for the divestment of its Russian business through a sale of 100% JSC Polymetal’s shares to a third party, JSC Mangazeya Plus, as described in Note 24. On 16 February 2024, US Department of the Treasury’s Office of Foreign Asset Control (“OFAC”) confirmed to the Company that it would not impose sanctions on non-US persons, including Polymetal International Plc, for participating in or facilitating such a transaction. The Group determined that these implications did not have any material effect on the Group’s liquidity position and its ability to finance its obligations.
On 7 March 2024 the transaction was approved by the Shareholders General Meeting and, following receipt of required regulatory approvals, the transaction was completed on the same day.
To assess the resilience of the Group’s going concern assessment in light of the macroeconomic volatility, management performed the stress downside scenario that is considered plausible over the next 12 months from the date of approval of the 2023 condensed consolidated financial statements. As such, this does not represent the Group’s ‘best estimate’ forecast, but was considered in the Group’s assessment of going concern, reflecting the current evolving circumstances and the most significant and plausible changes in macro assumptions identified at the date of performing of the going concern assessment.
The Group has already taken precautionary measures to manage liquidity and provide flexibility for the future. In addition, it was assumed that the Group has adapted its sales routes and supply chain and the net cash flows generated will be available for use within the Group. Under the stress scenario, the Group’s income and profits are affected by simultaneous decrease of gold prices by 5% and local currency appreciation by 10%, as well as 10% overrun of development capital expenditure.
At the reporting date, the Group holds US$ 329 million of cash and US$ 100 million of undrawn credit facilities (excluding assets sold in March 2024), which when combined with the forecast net cash flows under the stress scenario above, is considered to be adequate to meet the Group’s financial obligations as they fall due over the next 12 months. No borrowing covenant requirements are expected to be breached in the stress scenario. The Group expects to settle obligations as they fall due but also has mitigating actions available such as reducing production volumes and variable mining costs where possible, reducing and deferring non-essential and non-committed capital expenditure.
The Board is therefore satisfied that the Group’s forecasts and projections, including the stress scenario above, demonstrate that the Group has adequate resources to continue in operational existence for at least 12 months from the date of approval of the 2023 condensed consolidated financial statements and that it is appropriate to adopt the going concern basis in preparing the condensed consolidated financial statements for the year ended 31 December 2023.  
DIRECTORS’ RESPONSIBILITY STATEMENT
Directors are responsible for the preparation of the condensed consolidated financial statements that present the financial position of Polymetal International Plc (the “Company”) and its subsidiaries (the “Group”) as of 31 December 2023, and the results of its operations, cash flows and changes in equity for the year then ended based on the recognition, derecognition, measurement and classification principles of International Financial Reporting Standards (“IFRS”).

In preparing the condensed consolidated financial statements, directors are responsible for:
properly selecting and applying accounting policies;
presenting information, including accounting policies, in a manner that provides relevant, reliable, comparable and understandable information;
providing additional disclosures when compliance with the specific requirements in IFRSs are insufficient to enable users to understand the impact of particular transactions, other events and conditions on the Group’s consolidated financial position and financial performance; and
making an assessment of the Group’s ability to continue as a going concern.

Directors also are responsible for:
designing, implementing and maintaining an effective and sound system of internal controls throughout the Group;
maintaining adequate accounting records that are sufficient to show and explain the Group’s transactions and disclose with reasonable accuracy at any time the consolidated financial position of the Group, and which enable them to ensure that condensed consolidated financial statements of the Group comply with IFRS;
taking such steps as are reasonably available to them to safeguard the assets of the Group; and
preventing and detecting fraud and other irregularities.

Condensed consolidated financial statements of the Group for the year ended 31 December 2023 were approved by Board of Directors on 14 March 2024.

By order of Board of Directors:

Evgueni Konovalenko
Senior Independent Non-Executive Director

Vitaly Nesis
Group Chief Executive Officer
14 March 2024

POLYMETAL INTERNATIONAL PLC

CONDENSED CONSOLIDATED INCOME STATEMENT


Year ended Year ended
Note31 December 2023 31 December 2022
US$m US$m

Revenue53,025 2,801
Cost of sales6(1,459) (1,690)
Gross profit1,566 1,111

General, administrative and selling expenses10(274) (311)
Other operating expenses, net11(117) (142)
Impairment of non-current assets, net14(126) (825)
Share of loss in joint ventures16(2) -
Operating profit/(loss)1,047 (167)

Foreign exchange loss, net(174) (32)
Gain/(loss) on disposal of subsidiaries3113 (2)
Change in fair value of financial instruments20(8) (20)
Finance expenses12(162) (119)
Finance income27 8
Profit/(loss) before income tax843 (332)

Income tax13(315) 44
Profit/(loss) for the year528 (288)

Profit/(loss) for the year attributable to:
Equity shareholders of the Parent528 (288)
528 (288)
Earnings/(loss) per share (US$)
Basic211.11 (0.61)
Diluted211.11 (0.61)



POLYMETAL INTERNATIONAL PLC
CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME



Year ended Year ended
Note31 December 2023 31 December 2022
US$m US$m

Profit/(loss) for the year 528 (288)
Other comprehensive (loss)/income, net of income tax (528) 338
Items that will not be reclassified subsequently to profit or loss
Effect of translation to presentation currency 17 -

Items that may be reclassified to profit or loss
Fair value (loss)/gain arising on hedging instruments during the year20 (8) 16
Exchange differences on translating foreign operations (592) 365
Currency exchange differences on intercompany loans forming net investment in foreign operations, net of income tax 55 (43)
Total comprehensive income for the year - 50

Total comprehensive income for the year attributable to:
Equity shareholders of the Parent - 50

POLYMETAL INTERNATIONAL PLC

CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION



Note31 December 2023 31 December 2022
AssetsUS$m US$m

Property, plant and equipment152,998 3,392
Right-of-use assets76 131
Goodwill11 14
Investments in associates and joint ventures16129 13
Non-current accounts receivable107 31
Other non-current financial assets9 24
Deferred tax asset13192 142
Non-current inventories17115 133
Total non-current assets3,637 3,880

Current inventories171,178 1,057
Prepayments to suppliers180 185
Income tax prepaid46 64
VAT receivable131 148
Trade and other receivables261 103
Other financial assets at FVTPL5 10
Cash and cash equivalents23842 633
Total current assets2,643 2,200

Total assets6,280 6,080

Liabilities and shareholders' equity

Current borrowings18(1,005) (514)
Accounts payable and accrued liabilities(240) (270)
Income tax payable(20) (11)
Other taxes payable(81) (68)
Current portion of contingent consideration liability20(15) (9)
Current lease liabilities23(18) (25)
Total current liabilities(1,379) (897)

Non-current borrowings18(2,220) (2,512)
Contingent and deferred consideration liabilities20(29) (112)
Deferred tax liability13(252) (107)
Environmental obligations(69) (76)
Non-current lease liabilities23(52) (106)
Other non-current liabilities(26) (28)
Total non-current liabilities(2,648) (2,941)
Total liabilities(4,027) (3,838)
NET ASSETS2,253 2,242

Stated capital account21- 2,450
Share capital2114 -
Share premium212,436 -
Share-based compensation reserve33 35
Cash flow hedging reserve8 16
Translation reserve(2,063) (1,543)
Retained earnings1,825 1,284
Total equity2,253 2,242

Total liabilities and shareholders’ equity (6,280) (6,080)


POLYMETAL INTERNATIONAL PLC

CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS


Year ended Year ended
Note 31 December 2023 31 December 2022
US$m US$m

Net cash generated by operating activities23 575 206

Cash flows from investing activities
Purchases of property, plant and equipment (679) (794)
Net cash (outflow)/inflow on asset acquisitions3 (24) 123
Proceeds from disposal of subsidiaries, net of cash disposed of3 21 5
Loans advanced (60) (19)
Repayment of loans provided 29 3
Contingent consideration received 7 3

Net cash used in investing activities (706) (679)

Cash flows from financing activities
Borrowings obtained23 1,324 3,885
Repayments of borrowings23 (944) (3,029)
Repayments of principal under lease liabilities23 (21) (18)
Acquisition of non-controlling interest - (24)
Contingent consideration paid23 - (27)
Net cash from financing activities 359 787

Net increase in cash and cash equivalents 228 314
Cash and cash equivalents at the beginning of the year23 633 417
Effect of foreign exchange rate changes on cash and cash equivalents (19) (98)
Cash and cash equivalents at the end of the year23 842 633

POLYMETAL INTERNATIONAL PLC

CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY



NoteStated capital accountShare capitalShare premiumShare-based compensation reserveCash flow hedging reserveTranslation reserveRetained earningsTotal equity
US$mUS$mUS$mUS$mUS$mUS$mUS$mUS$m

Balance at 1 January 2022 2,450--31-(1,865)1,5872,203
Loss for the year------(288)(288)
Other comprehensive income, net of income tax----16322-338
Total comprehensive income/(loss)----16322(288)50
Share-based compensation---13---13
Acquisition of non-controlling interest------(24)(24)
Transfer to retained earnings---(9)--9-
Balance at 31 December 20222,450--3516(1,543)1,2842,242

Profit for the year------528528
Other comprehensive loss, net of income tax----(8)(520)-(528)
Total comprehensive income/(loss)-- - -(8)(520)528-
Redomiciation to AIFC21(2,450)142,436-- - - -
Share-based compensation---11---11
Transfer to retained earnings---(13)--13-
Balance at 31 December 2023-142,436338(2,063)1,8252,253

1.GENERAL

Corporate information
Polymetal Group is a leading gold and silver mining group, operating in Kazakhstan and Russia.
Polymetal International plc (the “Company”) is the ultimate parent entity of Polymetal Group. The Company was incorporated on 29 July 2010 as a public limited company under Companies (Jersey) Law. On 8 August 2023, the Group completed the re-domiciliation of the Company from Jersey to the Astana International Financial Centre ("AIFC"), Republic of Kazakhstan. The Company is listed on the AIX, which has become the Company’s primary stock exchange, while its listing on London stock exchange was cancelled on 28 August 2023. The Company also maintains a secondary listing on Moscow Exchange (MOEX).
On 19 May 2023, JSC Polymetal, the holding company for the Group’s assets located in the Russian Federation, and its subsidiaries were designated by the U.S. Department of State pursuant to Executive Order 14024 for operating in the metals and mining sector of the Russian economy. Following the designation the Board of Directors of the Company (the “Board”) set up a special committee of independent non-executive directors to ensure full and comprehensive compliance with U.S. sanctions. The Company and its non-Russian subsidiaries are not subject to blocking sanctions.
In the light of these developments, and in the interests of preserving shareholder value, the Board and the Special Committee undertook a strategic process to review all possible options in respect of JSC Polymetal and its subsidiaries (JSC Polymental Group) divestment in order to restore value for Polymetal shareholders and de-risk its ongoing operations.
Based on circumstances existing as of 31 December 2023, the Group has determined that JSC Polymetal and its subsidiaries did not meet the definition of the disposal group in accordance IFRS 5 Non-current Assets Held for Sale and Discontinued Operations.
In February 2024, the Group entered into contracts for the divestment of its Russian business through a sale of 100% JSC Polymetal’s shares to a third party, JSC Mangazeya Plus, as described in Note 24. On 16 February 2024, US Department of the Treasury’s Office of Foreign Asset Control (“OFAC”) confirmed to the Company that it would not impose sanctions on non-US persons, including Polymetal International Plc, for participating in or facilitating such a transaction. On 7 March 2024, following receipt of required regulatory and shareholder approvals, the transaction was completed.

Going concern
In assessing its going concern status, the Group has taken into account principal risks and uncertainties, financial position, sources of cash generation, anticipated future trading performance, borrowings and other available credit facilities, and forecasted compliance with covenants on those borrowings, and capital expenditure commitments and plans.
In the going concern assessment, the Group also considered the implications of sanctions imposed by U.S. Department of State on JSC Polymetal, the Company’s subsidiary in the Russian Federation, and the imminent sale of Russian business in March 2024, as described above. The Group determined that these implications did not have any material effect on the Group’s liquidity position and its ability to finance its obligations.
On 7 March 2024 the transaction was approved by the Shareholders General Meeting and, following receipt of required regulatory approvals, the transaction was completed on the same day.
To assess the resilience of the Group’s going concern assessment in light of the macroeconomic volatility, management performed the stress downside scenario that is considered plausible over the next 12 months from the date of approval of the 2023 condensed consolidated financial statements. As such, this does not represent the Group’s ‘best estimate’ forecast, but was considered in the Group’s assessment of going concern, reflecting the current evolving circumstances and the most significant and plausible changes in macro assumptions identified at the date of performing of the going concern assessment.
The Group has already taken precautionary measures to manage liquidity and provide flexibility for the future. In addition, it was assumed that the Group has adapted its sales routes and supply chain and the net cash flows generated will be available for use within the Group. Under the stress scenario, the Group’s income and profits are affected by simultaneous decrease of gold prices by 5% and local currency appreciation by 10%, as well as 10% overrun of development сapital expenditure.
At the reporting date, the Group holds US$ 329 million of cash and US$ 100 million of undrawn credit facilities (excluding assets sold in March 2024), which when combined with the forecast net cash flows under the stress scenario above, is considered to be adequate to meet the Group’s financial obligations as they fall due over the next 12 months. No borrowing covenant requirements are expected to be breached in the stress scenario. The Group expects to settle obligations as they fall due but also has mitigating actions available such as reducing production volumes and variable mining costs where possible, reducing and deferring non-essential and non-committed capital expenditure.
The Board is therefore satisfied that the Group’s forecasts and projections, including the stress scenario above, demonstrate that the Group has adequate resources to continue in operational existence for at least 12 months from the date of approval of the 2023 condensed consolidated financial statements and that it is appropriate to adopt the going concern basis in preparing the condensed consolidated financial statements for the year ended 31 December 2023.
Basis of presentation
The Group’s annual condensed consolidated financial statements for the year ended 31 December 2023 are prepared in accordance with the recognition, derecognition, measurement and classification principles of International Financial Reporting Standards (IFRS). The financial statements have been prepared on the historical cost basis, except for certain financial instruments which are measured at fair value as of end of the reporting period and share-based payments which are recognised at fair value as of the measurement date.
The accounting policies and methods of computation applied are consistent with those adopted and disclosed in the Group’s annual report for the year ended 31 December 2022 on pages 177 to 187, except as described below.
During the year ended 31 December 2023 management has reviewed the segmental presentation of financial information it requires to assess performance and allocate resources, As a result the presentation of segmental information was re-assessed, including comparative information as described in Note 4.
The Group determined that starting from August 2023, following the re-domiciliation of the Company from Jersey to AIFC in Kazakhstan and due to the accumulation over time of those factors which are the main determinants of functional currency, there had been a change in facts and circumstances surrounding the operations of the Company, indicating that the functional currency of the Company and some of its intermediate holding companies had changed from the US Dollar to the KZT. In accordance with IAS 21 The Effects of Changes in Foreign Exchange Rates, this change has been accounted for prospectively from 1 August 2023.
New standards adopted by the Group
IFRS 17 Insurance Contracts, effective for annual period beginning on or after 1 January 2023 with earlier application permitted;
Amendments to IAS 1 and IFRS Practice Statement 2 requiring that an entity discloses its material accounting policies, instead of its significant accounting policies, effective for annual period beginning on or after 1 January 2023 with earlier application permitted;
Amendments to IAS 12 clarifying that the initial recognition exemption does not apply to transactions in which equal amounts of deductible and taxable temporary differences arise on initial recognition, effective for annual period beginning on or after 1 January 2023 with earlier application permitted;
Amendments to IAS 12 – International Tax Reform – Pillar Two Model Rules, introducing a temporary exception to the accounting requirements for deferred taxes in IAS 12, so that an entity would neither recognise nor disclose information about deferred tax assets and liabilities related to Pillar Two income taxes; and
Amendments to IAS 8 replacing the definition of a change in accounting estimates with a definition of accounting estimates, effective for annual period beginning on or after 1 January 2023 with earlier application permitted.
The Group has determined that these standards and interpretations do not have a material impact on its condensed consolidated financial statements or are not applicable to the Group.
New accounting standards issued but not yet effective
The following amendments to the accounting standards were in issue but not yet effective as of date of approval of these condensed consolidated financial statements:
Amendments to IAS 1 Presentation of Financial Statements regarding non-current liabilities with covenants, effective for annual periods beginning on or after 1 January 2024, with early application permitted;
Amendments to IFRS 16 Leases regarding lease liabilities in sale and leaseback transactions, effective for annual period beginning on or after 1 January 2024 with earlier application permitted;
Amendments to IAS 7 Statement of Cash Flows and IFRS 7 Financial Instruments: Disclosures regarding supplier finance arrangements, effective for annual period beginning on or after 1 January 2024 with earlier application permitted;
Amendments to IAS 21 The Effects of Changes in Foreign Exchange Rates: Disclosures of information that enables users of financial statements to understand the impact of a currency not being exchangeable, effective for annual period beginning on or after 1 January 2025 with earlier application permitted; and
Amendments to IFRS 10 Consolidated Financial Statements and IAS 28 Investments in Associates and Joint Ventures regarding the sale or contribution of assets between an investor and its associate or joint venture, the effective date of the amendments has yet to be set. However, earlier application of the amendments is permitted.
The Group has determined that these standards and interpretations are unlikely to have a material impact on its condensed consolidated financial statements or are not applicable to the Group.

2.CRITICAL ACCOUNTING JUDGEMENTS AND KEY SOURCES OF ESTIMATION UNCERTAINTY
In the course of preparing the condensed consolidated financial statements, management necessarily makes judgements and estimates that can have a significant impact on those financial statements. The determination of estimates requires judgements which are based on historical experience, current and expected economic conditions, and all other available information.
Estimates and underlying assumptions are reviewed on an ongoing basis, with revisions recognised in the period in which the estimates are revised and in the future periods affected. The judgements involving a higher degree of estimation or complexity are set out below.
Critical accounting judgements
The following are the critical accounting judgements (apart from judgements involving estimation which are dealt with separately below), made during the year that had the most significant effect on the amounts recognised in the condensed consolidated financial statements.
Re-assessment and impairment of Amursk POX CGU
Impairment charges are assessed at the CGU level. Significant management judgement is applied in determining the Group’s CGUs, particularly when assets relate to integrated operations, and where changes in CGU determinations could impact the impairment recognised. It was previously determined that Amursk POX represented a shared corporate asset in accordance with IAS 36 Impairment of assets. During the year ended 31 December 2023, the Group has determined that due to the changes in the mode of assets utilisation that generate a revenue stream for Amursk POX, it became a separate CGU. Such changes included continued use of Amursk POX processing facility to treat Kyzyl refractory concentrate on the terms of tolling agreement, as entailed by provisions of JSC Polymetal divestment (Notes 1, 24) and the offtake arrangement over Veduga concentrate, described below. This judgement was applied to the impairment review as of 31 December 2023, resulting in impairment charge of US$ 165 million (Note 14).

Indicators of Impairment and reversal of impairment
The Group considers both external and internal sources of information in assessing whether there are any indications that CGUs are impaired. The external sources of information the Group considers include changes in the market, economic and legal environment in which the Group operates, that are usually not within its control, and are expected to affect the recoverable amount of CGUs. Internal sources of information include the manner in which mining properties, plant and equipment are being used or are expected to be used; and indicators of the economic performance of the assets, historical exploration and operating results. The primary external factors considered are changes in spot and forecast metal prices, market rates of returns that form discount rates, and changes in laws and regulations. The primary internal factors considered are the Group’s current mine performance against expectations, changes in mineral reserves and resources, life of mine plans and exploration results.
Assets (other than goodwill) that have been previously impaired should be assessed for indicators of both impairment and impairment reversal. Such assets are generally carried on the balance sheet at a value close to their recoverable amount at the last assessment. Therefore in principle any change to operational or macroeconomic parameters could result in further impairment or impairment reversal if an indicator is identified.
During year ended 31 December 2023 the Group determined that due to updated operational plans and futher advancement of the project, impairment loss previously recognised for Veduga was fully reversed as detailed in Note 14. As a result the reversal of impairment loss of US$ 68 million was recorded.
Other significant operating assets that the Group has previously impaired include Nezhda-Prognoz and Kutyn CGU. These assets had a combined carrying value of US$ 751 million as at 31 December 2023. Despite the external indicators such as commodities’ prices and foreign exchange rates showed favorable changes, there is no significant positive change in these CGUs’ expected economic performance, and therefore no indicators of the reversal of previously recognised impairment loss were identified.
Veduga (Amikan GRK LLC) Joint Venture
In September 2023, the Group disposed of the stake in Amikan LLC (holder of Veduga deposit license), which resulted in loss control of over subsidiary, as described in Note 3. The Group retained interest of 49.9% in Amikan and entered into a number of corporate arrangements with the new shareholder regarding project financing, governance and operations.
When the Group enters into an arrangement where it has the power to participate in the financial and operating policy decisions of an investee or into arrangements with other parties for the joint ownership of particular assets or developments, it must assess whether the arrangements constitute significant influence, control, joint operations or a joint venture based on the rights and obligations of the parties to the arrangements.
Based on the governance structure of the investee, it was determined that the arrangement requires the unanimous consent of the parties sharing control. The preliminary offtake arrangement to purchase the output by Amursk POX, entailed by the shareholders agreement, does not indicate that the parties have rights to the substantially all economic benefits of the assets and, therefore, in effect do not have the obligation for liabilities, as pricing mechanism relates only to the market metal price and related adjustments is in line with the market practice, with no additional financing arrangements.
Therefore it was concluded that the joint arrangement provides the parties with rights to the net assets of the arrangement and, therefore, the retained investment represents a joint venture. The retained investment was initially recognised at fair value as of date of transaction, as described in Note 3.
Accounting for acquisitions
To determine the appropriate accounting approach to be followed for an acquisition transaction, the Group applies judgement to assess whether the acquisition is of a business, and therefore within scope of IFRS 3 Business Combinations, or is of a group of assets that do not constitute a business and is therefore outside scope of IFRS 3. In making this determination, management evaluates the inputs, processes and outputs of the asset or entity acquired. Judgement is used to determine whether an integrated set of activities and assets is capable of being conducted and managed for the purpose of providing a return in the form of dividends, lower costs or other economic benefits directly to investors or other owners, members or participants. The acquisitions of subsidiaries during reporting year have been assessed as asset acquisitions (Note 3).
Recoverability of exploration and evaluation assets
Exploration and evaluation assets include mineral rights and exploration and evaluation costs, including geophysical, topographical, geological and similar types of costs. Exploration and evaluation costs are capitalised if management concludes that future economic benefits are likely to be realised and determines that economically viable extraction operation can be established as a result of exploration activities and internal assessment of mineral resources.
According to IFRS 6 Exploration for and evaluation of mineral resources, the potential indicators of impairment include: management’s plans to discontinue the exploration activities, lack of further substantial exploration expenditure planned, expiry of exploration licences in the period or in the nearest future, or existence of other data indicating the expenditure capitalised is not recoverable. At the end of each reporting period, management assesses whether such indicators exist for the exploration and evaluation assets capitalised, which requires significant judgement. During the year ended 31 December 2023 the Group recognised impairment loss related to the individual exploration and evaluation assets of US$ 29 million as detailed in Note 14.
Use of estimates
The preparation of financial statements requires the Group to make estimates and assumptions that affect the amounts of the assets and liabilities recognised, amounts of revenue and expenses reported, and contingent liabilities disclosed, as of the reporting date. The determination of estimates is based on current and expected economic conditions, as well as historical data and statistical and mathematical methods as appropriate.
Key sources of estimation uncertainty
Key sources of estimation uncertainty reflect those sources of estimation uncertainty which may have a possible material impact of resulting in a material adjustment to the carrying amount of assets and liabilities within the next financial year. They include: cash flow projections for impairment testing and impairment reversal, valuation of contingent consideration assets and liabilities and calculation of net realisable value of stockpiles and work-in progress, mineral reserves and resources assessment and life of mine plans, useful lives of production and other assets, environmental provision and recoverability of deferred tax assets.
DCF models are developed for the purposes of impairment testing, valuation of contingent consideration assets and liabilities, calculation of net realisable value of metal inventories and assessment of the recoverability of deferred tax assets. Expected future cash flows used in DCF models are inherently uncertain and could change over time. They are affected by a number of factors including ore reserves, together with economic factors such as commodity prices, exchange rates, discount rates and estimates of production costs and future capital expenditure.
Ore reserves and mineral resources – Recoverable reserves and resources are based on the proven and probable reserves and resources in existence. Reserves and resources are incorporated in projected cash flows based on ore reserve statements and exploration and evaluation work undertaken by appropriately qualified persons (see below). Mineral resources, adjusted by certain conversion ratios, are included where management has a high degree of confidence in their economic extraction, despite additional evaluation still being required prior to meeting the required confidence to convert to ore reserves.

Commodity prices – Commodity prices are based on latest internal forecasts, benchmarked against external sources of information. Polymetal currently uses flat real long-term gold and silver prices of US$ 1,900 per ounce for 2024, US$ 1,800 per ounce from 2025 per ounce (2022: of US$ 1,800 per ounce for 2023, US$ 1,700 per ounce from 2024) and US$ 23 per ounce (2022: and US$ 20 per ounce for 2023, US$ 21 per ounce from 2024), respectively.

Foreign exchange rates – Foreign exchange rates are based on observable spot rates, or on latest internal forecasts, benchmarked with external sources of information for relevant countries of operation, as appropriate. The RUB/US$ exchange rates are estimated at 90 RUB/US$ for 2024 (2022: 65 RUB/US$ for 2023, at 73 RUB/US$ for 2024 and 75 RUB/US$ from 2025). The KZT/US$ exchange rate are estimated at 450 KZT/USD for 2024 and 500 KZT/USD for 2025 and beyond (2022: 450 KZT/US$ for 2023, at 502 KZT/US$ from 2024), respectively.

Discount rates – The Group used a post-tax real discount rate of 12.5% for Russia assets and 8.7% for Kazakhstan (2022: 14.1% for Russia assets and 9% for Kazakhstan). Post-tax cash flow projections used in the value in use impairment models are discounted based on these rates.

Operating costs, capital expenditure and other operating factors – Cost assumptions incorporate management experience and expectations, as well as the nature and location of the operation and the risks associated therewith. Underlying input cost assumptions are consistent with related output price assumptions. Other operating factors, such as the timelines of granting licences and permits are based on management’s best estimate of the outcome of uncertain future events at the balance sheet date.

Sensitivity analysis
The impairment charge of US$ 165 million for Amursk POX property, plant and equipment was recognised during the year ended 31 December 2023 (Note 14). The recoverable amount was estimated based on a value in use calculation.
The impairment assessment is inherently sensitive to plausible changes in certain economic and operational key input assumptions within the next financial year, which could increase or reduce the CGU’s recoverable value estimate.
Management performed an analysis as to whether a reasonably possible adverse change to any of the key assumptions would lead to further impairment. The table below summarises the outcomes of the following isolated scenarios and respective additional impairment that would be recognised.
ScenarioUS$m

10% simultaneous decrease in gold and silver prices over the life of mine73
10% appreciation in RUB/US$ exchange rates;6
10% increase in operating expenses over the life of mine60
1% increase in the discount rate applied26
Each of the sensitivities above has been determined by assuming that the relevant key assumption moves in isolation, and without regard to potential mine plan changes and other management decisions which would be taken to respond to adverse changes in existing management projections.
The sensitivities of contingent consideration liabilities measured at FVTPL of US$ 44 million at 31 December 2023 (31 December 2022: US$ 36 million) and inventories held at net realisable value of US$ 80 million at 31 December 2023 (31 December 2022: US$ 95 million) to a reasonably possible change in key assumptions described above are not considered material due to materiality of the respective balances.
Recoverability of deferred tax assets
Deferred tax assets are reviewed at each reporting date and reduced to the extent that it is no longer probable that sufficient taxable profit will be available to allow all or part of the deferred tax asset to be utilised. This review takes into account the factors such as estimated future production, projected commodity prices, operating costs, future capital expenditure, as described above. If actual results differ from these estimates or if these estimates must be adjusted in future periods, the financial position, results of operations and cash flows may be negatively affected. Deferred tax assets arising from tax losses carried forward, as well as applicable tax legislation, are described in Note 13.
Climate change
We have assessed and set out the Group’s climate risks and opportunities as part of our commitment to climate disclosure within the Strategic Report. Mitigation and adaptation measures that may be required in the future to combat the physical and transition risks of climate change could also have potential implications for the Group’s financial statements. This would be the case where assets and liabilities are measured based on an estimate of future cash flows.
In preparing the Group’s financial statements, climate-related strategic decisions have impacted the following:
Our decarbonisation and clean energy initiatives considered and approved by the Board were included in future cash flow projections, underpinned by estimates for recoverable amounts of property, plant and equipment, as deemed relevant; and
The provision for mine closure costs impacted by climate risks and opportunities.
We have adopted both mitigation and adaptation measures within our climate management system. We focus on renewable energy, carbon-intensive fuel replacement and innovative technologies to both mitigate climate change impacts and to reduce our carbon footprint. The adaptation measures we use are based on climate models, which inform the design, construction, operation and closure of our mining assets.
Significant judgements and key estimates made by the Group may be impacted in the future by changes to our climate change strategy or in global commitments to decarbonisation. This could, in turn, result in material changes to the financial results and the carrying values of certain assets and liabilities in future reporting periods. As at the reporting date, the Group believes that there is no material impact on balance sheet carrying values of assets or liabilities.
3.ACQUISITIONS AND DISPOSALS
Veduga (Amikan GRK LLC)
In September 2023, the Group has agreed to cancel its historic call and put options and a shareholder agreement over 40.6% share in GRK Amikan LLC (“Amikan”) with the previous joint venture (JV) partner (refer to the transaction disclosure in the condensed consolidated financial statements for the year ended 31 December 2020). This allowed the Group to form a new joint venture over Amikan. The 40.6% stake was acquired from the previous JV partner by a new third party. Subsequently, JSC Polymetal disposed of its 9.5% stake in Amikan to the same third party for a сash consideration of US$ 21 million. As a result, the Group now owns 49.9% interest of Amikan. Simultaneously, JSC Polymetal entered into number of corporate arrangements with the new shareholder regarding Amikan project financing, governance and operations.
In 2020 at the inception of options the Group determined that the call option over 40.6% stake represents a derivative containing potential voting right, that provided the Group access to the returns associated with related ownership interest, and thus in accordance with IFRS 10 Consolidated financial statements the Group accounted for the options over 40.6% interest as is they were already exercised and consolidated 100% interest in Amikan with the option exercise price recognised as a deferred consideration payable. At the disposal date, the fair value of deferred consideration payable amounted to US$ 88 million, which was recognised as a part of the consideration received on disposal.
As a result of this transaction the Group has effectively disposed of 50.1% interest of the investee. The retained interest of 49.9% was valued at the fair value of US$ 110 million at the date when control was lost in accordance with IFRS 10 requirements. The fair value was determined based on consideration received from third party for 9.5% stake, which was supported by life-of-mine model.
Based on the governance structure of the investee, policy-making processes and the board of directors composition, it was determined that all key decisions require the unanimous consent of the parties sharing control and provides the parties of the joint arrangement with rights to its net assets, therefore, the investment was classified as a joint venture. Subsequently, the investment is accounted for using the equity method.
The summary of transaction is presented below.

US$m
Property, plant and equipment 162
Inventories22
Other assets3
Income tax(14)
Accounts payable(3)
Intercompany loans and other accounts (64)
Net assets disposed of 106

Cash consideration received 21
Deferred consideration cancelled 88
Fair value of the investment retained 110
Less net assets disposed of(106)
Gain on disposal of subsidiary 113

Other acquisitions
Other individually insignificant acquisitions of exploration assets during the year ended 31 December 2023 of US$ 52 million in total, related to consolidation of certain former joint ventures, including the Baksy project project in Kazakhstan (Note 16), and the acquisition a number of exploration interests in Russia. All transactions represented asset acquisitions in accordance with IFRS 3 Business Combinations, as the acquired companies did not have any substantive processes required to create outputs. The summary of net assets acquired is presented below:
Baksy NORK LLC OGK LLC Utkinskaya Uenma TOTAL
US$m US$m US$m US$m US$m $m
Property, plant and equipment19 5 3 19 6 52
Other assets/(liabilities), net(1)- 1 - - -
Intercompany loans and other accounts(5)(4)(1)- - (10)
Net assets acquired131319642

Cost of equity investment reclassified- - 1 - - 1
Loan assignment- - - 17 - 17
Cash consideration13 1 2 2 6 24
Total consideration131319642


4.SEGMENT INFORMATION
The Group’s operating segments are aligned to those businesses that are evaluated regularly by the chief operating decision maker (the CODM) in deciding how to allocated resources and in assessing performance. Operating segments with similar economic characteristics are aggregated into reportable segments.
In May 2023, following the designation of JSC Polymetal by the U.S. Department of State pursuant to Executive Order 14024, the governance and management structure of the Group was changed. As a part of ring-fencing the Group’s Russian subsidiaries to ensure sanctions compliance the management of the Russian operations has been delegated to the executives of JSC Polymetal, while the Company’s Board and management focused on the operations of the Group’s assets located in Kazakhstan, as well as separation of the Group’s assets by jurisdiction, as described in Note 1.
As a result of these changes management of the Company has re-assessed presentation of financial information by segments it requires to assess performance and allocate resources. It was concluded that jurisdiction-based reporting format is more meaningful from a management and forecasting perspective, as well as better aligned to the new management structure, internal reporting and processes. The comparative information was presented in line with the current year format.
Therefore the Group has identified two reportable segments in 2023:
Kazakhstan (Varvarinskoye JSC, Komarovskoye Mining Company LLC, Bakyrchik Mining Venture LLC);
Russian Federation (aggregating Khabarovsk, Magadan, Ural and Yakutia operating segments).

The measure which management and the CODM use to evaluate the performance of the Group is a segment Adjusted EBITDA, which is an Alternative Performance Measure (APM).
The accounting policies of the reportable segments are consistent with those of the Group’s accounting policies under IFRS. Revenue and cost of sales of the production entities are reported net of any intersegmental revenue and cost of sales, related to the intercompany sales of ore and concentrates.
Business segment current assets and liabilities, other than current inventory, are not reviewed by the CODM and therefore are not disclosed in these condensed consolidated financial statements. Additionally, net debt is included in performance measures, reviewed by CODM. The segment adjusted EBITDA reconciles to the profit before income tax as follows:

4. SEGMENT INFORMATION (CONTINUED)

Period ended 31 December 2023Period ended 31 December 2022
KAZAKHSTANRUSSIATotalKAZAKHSTANRUSSIATotal
Revenue from external customers 893 2,132 3,0259331,8682,801
Cost of sales, excluding depreciation, depletion and write-down of inventories to net realisable value 378 833 1,2113401,0151,355
Cost of sales 442 1,017 1,4594151,2751,690
Depreciation included in Cost of sales (64) (190) (254)(75)(197)(272)
Reversal/(write-down) of metal inventories to net realisable value - 8 8-(65)(65)
(Write-down)/reversal of non-metal inventories to net realisable value - (2) (2)-11
Rehabilitation expenses - - --11
General, administrative and selling expenses, excluding depreciation, amortisation and share-based compensation 58 198 25647241288
General, administrative and selling expenses 71 203 27462249311
Depreciation included in SGA (2) (5) (7)(2)(8)(10)
Share-based compensation (11) - (11)(13)-(13)
Other operating expenses excluding additional tax charges 18 80 9830111141
Other operating expenses, net 18 99 11732110142
Bad debt and expected credit loss allowance - (19) (19)-11
Additional tax charges/fines/penalties - - -(2)-(2)
Share of losses of associates and joint ventures - 2 2---
Adjusted EBITDA 439 1,019 1,4585165011,017
Depreciation 66 195 26177205282
Rehabilitation expenses - - --(1)(1)
Write-down/(reversal) of non-metal inventories to net realisable value - 2 2-(1)(1)
(Reversal)/write-down of metal inventories to net realisable value - (8) (8)-6565
Impairment of non-current assets, net 16 110 126-825825
Share-based compensation 11 - 1113-13
Bad debt and expected credit loss allowance - 19 19-(1)(1)
Additional tax charges/fines/penalties - - -2-2
Operating profit 346 701 1,047424(591)(167)
Foreign exchange loss (174) (32)
Gain/(loss) on disposal of subsidiaries 113 (2)
Change in fair value of financial instruments (8) (20)
Finance expenses (162) (119)
Finance income 27 8
Profit/(loss) before income tax 843 (332)
Income tax (315) 44
Profit/(loss) for the year 528 (288)
Current metal inventories 171 647 818111594705
Current non-metal inventories 62 298 36046306352
Non-current segment assets: ---
Property, plant and equipment, net 810 2,188 2,9986962,6963,392
Goodwill - 11 11-1414
Non-current inventories 41 74 1153499133
Investments in associates 6 123 129-1313
Total segment assets 1,090 3,341 4,4318873,7224,609
Additions to non-current assets:
Property, plant and equipment 150 606 756108775883
Acquistion of assets 19 33 52-4949
Total segment liabilities
Net debt (174) (2,209) (2,383)(277)(2,116)(2,393)



5.REVENUE

Year ended 31 December 2023
Volume shipped (unaudited)Volume payable (unaudited)Average price ($ per oz/t payable) (unaudited)US$m



Gold (thousand ounces) 1,438 1,400 1,886 2,640
Silver (thousand ounces) 17,461 16,595 21.9 363
Copper (tonnes) 3,037 2,693 8,168 22
Total 3,025

Year ended 31 December 2022
Volume shipped (unaudited)Volume payable (unaudited)Average price ($ per oz/t payable) (unaudited)US$m



Gold (thousand ounces) 1,408 1,376 1,738 2,392
Silver (thousand ounces) 18,973 18,542 20.7 383
Copper (tonnes) 3,810 3,399 7,650 26
Total 2,801


Included in revenues for the year ended 31 December 2023 are those arisen from the sales to the Group’s largest customers, whose contribution to the Group’s revenue presented 10% or more of the total revenue. In 2023 revenues from such customers amounted to US$ 547 million, US$ 357 million and US$ 292 million (2022: US$ 754 million, US$ 446 million, US$ 452 million and US$ 233).
Geographical analysis of revenue by destination is presented below:

Year ended
31 December 202331 December 2022
US$mUS$m
Sales within the Russian Federation 1,251296
Sales to Asia 9691,284
Sales to Kazakhstan 8051,205
Sales to Europe -16
Total 3,0252,801


Presented below is an analysis per revenue streams:

Year ended
31 December 202331 December 2022
US$mUS$m
Bullions 1,5821,104
Concentrate 865915
Doré 547754
Ore 3128
Total 3,0252,801


6.COST OF SALES
Year ended
31 December 2023 31 December 2022
US$m US$m
Cash operating costs
On-mine costs (Note 7)632 741
Smelting costs (Note 8)532 567
Purchase of metal inventories from third parties127 69
Mining tax163 136
Total cash operating costs1,454 1,513

Depreciation and depletion of operating assets (Note 9)280 324
Rehabilitation expenses- (1)
Total costs of production1,734 1,836

Increase in metal inventories(276) (216)
(Reversal)/write-down of inventories to net realisable value (Note 17)(6) 64
Idle capacities and abnormal production costs7 6
Total1,459 1,690

7.ON-MINE COSTS
Year ended
31 December 2023 31 December 2022
US$m US$m
Services283 363
Labour153 175
Consumables and spare parts190 196
Other expenses6 7
Total (Note 6)632 741

8.SMELTING COSTS
Year ended
31 December 2023 31 December 2022
US$m US$m
Consumables and spare parts216 242
Services207 213
Labour104 110
Other expenses5 2
Total (Note 6)532 567


9.DEPLETION AND DEPRECIATION OF OPERATING ASSETS
Year ended
31 December 2023 31 December 2022
US$m US$m
On-mine182 228
Smelting98 96
Total in cost of production (Note 6)280 324
Less: absorbed into metal inventories(26) (52)
Depreciation included in cost of sales254 272

Depreciation of operating assets excludes depreciation relating to non-operating assets (included in general, administrative and selling expenses) and depreciation related to assets employed in development projects where the charge is capitalised.

10.GENERAL, ADMINISTRATIVE AND SELLING EXPENSES
Year ended
31 December 2023 31 December 2022
US$m US$m
Labour215 243
Share-based compensation11 13
Depreciation7 10
Services19 15
Other 22 30
Total274 311

11.OTHER OPERATING EXPENSES, NET

Year ended
31 December 2023 31 December 2022
US$m US$m
Exploration expenses35 62
Social payments34 44
Bad debt allowance19(1)
Expenses related to the investment in Special Economic Zone15 14
Taxes, other than income tax14 17
Change in estimate of environmental obligations(7) (2)
Other expenses7 8
Total117 142

For the operations held in the Special Economic Zone of the Russian Far East, Omolon Gold Mining Company LLC and Magadan Silver JSC are entitled to the decreased statutory income tax rate of 17%, as well as decreased mining tax rate (paying 60% of standard mining tax rates). In return for obtaining this tax relief the members of the regional free Economic Zone are obliged to invest 50% of their tax savings each year in the Special Economic Zone Development Programme, amounting to US$ 15 million in 2023 (2022: US$ 14 million).
Operating cash flows spent on exploration activities amounted to US$ 34 million (2022: US$ 61 million).
12.FINANCE EXPENSES
Year ended
31 December 2023 31 December 2022
US$m US$m
Interest expense on borrowings141 94
Unwinding of discount on contingent consideration liability (Note 23)7 10
Unwinding of discount on environmental obligations7 8
Unwinding of discount on lease liabilities (Note 23)7 7
Total162 119

During the year ended 31 December 2023 interest expense on borrowings excluded borrowing costs capitalised in the cost of qualifying assets of US$ 49 million (2022: US$ 35 million). These amounts were calculated based on the Group’s general borrowing pool and by applying an effective interest rate of 5.57% (2022: 4.53%) to weighted average balance of expenditure associated with qualifying assets.
13.INCOME TAX
Income tax expense for the years ended 31 December 2023 and 2022 recognised in the condensed consolidated income statement was as follows:
Year ended
31 December 2023 31 December 2022
US$m US$m
Current income taxes(235) (164)
Deferred income taxes(80) 208
Total(315) 44

A reconciliation between the reported amounts of income tax expense attributable to income before income tax is as follows:
Year ended
31 December 2023 31 December 2022
US$m US$m

Profit before income tax 843 (332)
Theoretical income tax (expense)/benefit at the tax rate of 20% (169) 66
Effect of Special Economic Zone and Regional Investment project decreased tax rates 16 (19)
Tax effect of withholding tax on intercompany dividends (161) 15
Non taxable net foreign exchange gains 37 25
Disposal of subsidiary 11 -
Effect of different tax rates of subsidiaries operating in other jurisdictions and windfall tax (7) 9
Change in unrecognised deferred taxes (9) (14)
Non-deductible interest expense (17) (6)
Other non-taxable income and non-deductible expenses, net (14) (27)
Adjustments in respect of prior periods (2) (5)
Total income tax expense(315) 44

The actual tax expense differs from the amount which would have been determined by applying the statutory rate of 20% for the Russian Federation and Kazakhstan to profit before income tax as a result of the application of relevant jurisdictional tax regulations, which disallow certain deductions which are included in the determination of accounting profit.
The Group has a number of tax concessions, therefore the tax rate varies for each separate entity from 0% to 20%.
Tax exposures related to the income tax
In 2023 and 2022 no individual material exposures were identified as probable and therefore provided for. Management has identified a total exposure in respect of contingent liabilities (Note 19) (covering taxes and related interest and penalties) of approximately US$ 38 million being uncertain tax positions (31 December 2022: US$ 122 million) which relate to income tax. This is connected largely to the more assertive position of the Russian tax authorities in their interpretation of tax legislation in several recent court cases for other taxpayers. Fiscal periods remain open to review by the tax authorities in respect of taxes for the three and five calendar years preceding the year of tax review for Russia and Kazakhstan respectively. In case of Regional Investment Project in Russian Federation fiscal period remains open to review for five years as well. While the Group believes it has provided adequately for all tax liabilities based on its understanding of the tax legislation, the above facts may create additional financial risks for the Group.
Management does not anticipate a significant risk of material changes in estimates in these matters in the next financial year.
Deferred taxation
Deferred taxation is attributable to the temporary differences that exist between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for tax purposes.
The following are the major deferred tax assets and liabilities recognised by the Group and movements thereon during the reporting period.
Mineral rightsExploration in progressBorrowings and other liabilitiesEnvironmental obligationTax lossesUndistributed earningsOtherTotal
US$mUS$mUS$mUS$mUS$mUS$mUS$mUS$m

At 1 January 2022(184)(66)1811100(22)4(139)
Charge to income statement8812(23)1862222208
Exchange differences(22)(9)2-3-(8)(34)
At 31 December 2022(118)(63)(3)12189-1835
Charge to income statement(4)(17)922(39)(151)37(80)
Disposal of subsidiaries1210(1)-(2)-(5)14
Exchange differences1515(23)(2)(28)(1)(5)(29)
At 31 December 2023(95)(55)6612119(152)45(60)

Deferred tax assets and liabilities are offset where the Group has a legally enforceable right to do so. The following analysis shows deferred tax balances presented for financial reporting purposes:
Year ended
31 December 202331 December 2022
US$mUS$m
Deferred tax liabilities(252)(107)
Deferred tax assets192142
Total(60)35

The Group believes that recoverability of the recognised deferred tax asset (DTA) of US$ 119 million at 31 December 2023 (2022: US$ 189 million), which is related to the tax losses carried forward, is more likely than not based upon expectations of future taxable income in the Russian Federation. It was concluded that there is sufficient evidence to overcome the recent history of losses based on forecasts of sufficient taxable income in the carry-forward period.
In accordance with Russian Federation tax law regarding loss carryforwards, they are limited to 50% of taxable profit in tax years through to 2026. Starting from 2027, the limitation will expire and it will be possible to fully utilise loss carryforwards against the corporate tax base in a given year. Losses incurred from 2007 can be carried forward for an indefinite period until fully utilised.
The Group’s estimate of future taxable income is based on established proven and probable reserves which can be economically developed. The related detailed mine plans and forecasts provide sufficient supporting evidence that the Group will generate taxable earnings to be able to fully realise its net DTA even under various stressed scenarios. The amount of the DTA considered realisable, however, could be reduced in the near term if estimates of future taxable income during the carry forward period are reduced due to delays in production start dates, decreases in ore reserve estimates, increases in environmental obligations, or reductions in precious metal prices.
No deferred tax asset has been recognised in respect of US$ 31 million (2022: US$ 95 million) of losses as it was not considered probable that there will be future taxable profits against which these losses can be utilised.
In 2023 the Group paid withholding income tax of US$ 10 million (2022: US$ 7 million) related to intercompany dividends, which were remitted during the year. As of 31 December 2023 the Group recognised deferred tax liability of US$ 152 million (31 December 2022: nil) in respect of the undistributed retained earnings of certain of the Group subsidiaries, which are expected to be remitted from these subsidiaries in foreseeable future (judged to be one year). No deferred tax liabilities for taxes that would be payable on the unremitted earnings of the Group subsidiaries is recognised where the Group determines that the undistributed profit of its subsidiaries will not be distributed in a foreseeable future (judged to be one year). The temporary differences associated with investments in subsidiaries, for which deferred tax liabilities have not been recognised, amounted to US$ 2.3 billion (2022: US$ 4.1 billion).

14.IMPAIRMENT OF NON-CURRENT ASSETS, NET
During year ended 31 December 2023 due to the updated operational plans and further advancement of the Veduga project (Amikan GRK LLC), the Group carried out an impairment review of the property, plant and equipment, related to this CGU. As a result of this review an impairment loss of US$ 68 million previously recognised for Veduga CGU was fully reversed.
An impairment charge of US$ 165 million in respect to Amursk POX is mainly attributable to the classification of Amursk POX as a separate CGU due to changes in the mode of assets utilisation (Note 2). Additionally, as a result of review of recoverability of exploration and evaluation assets, the Group recognised an impairment loss of US$ 29 million.
Total net impairment loss of US$ 126 million recognised comprised the following:
Amikan Amursk POX Viksha Bolshevik TOTAL
US$mUS$mUS$mUS$mUS$m
Property, plant and equipment
Exploration assets2-(13)(16)(27)
Development assets8---8
Mining assets48(29)--19
Capital construction in-progress 10(136)--(126)
Total 68(165)(13)(16)(126)

Amikan, Amursk POX and Viksha related to Russia reporting segment, Bolshevik was included in Kazakhstan reporting segment (Note 4).
The recoverable amount of the relevant cash-generating units is determined based on a value in use calculation. The impairment testing procedure, related assumptions and sensitivities are described in detail in Note 2 “Use of estimates” section above.

15.PROPERTY, PLANT AND EQUIPMENT

Development assets Exploration assets Mining assets Non-mining assets Capital construction in-progress Total
US$mUS$mUS$mUS$mUS$mUS$m
Cost
Balance at 1 January 2022384743,343747834,658
Additions 651925511533883
Transfers(13)-2452(234)-
Change in environmental obligations--12-820
Acquisitions291--1949
Eliminated on disposal of subsidiaries-(8)(10)--(18)
Disposals and write-offs including fully depleted mines--(152)-(1)(153)
Translation to presentation currency35(1)50639129
Balance at 31 December 2022500853,743931,1475,568
Additions 47262557421756
Transfers(282)(18)4912(193)-
Change in environmental obligations--7-(1)6
Acquisitions (Note 3)-52---52
Eliminated on disposal of subsidiaries (Note 3)(18)(4)(113)(2)(36)(173)
Disposals and write-offs including fully depleted mines-(16)(55)(3)(17)(91)
Translation to presentation currency(82)(14)(603)(23)(263)(985)
Balance at 31 December 20231651113,725741,0585,133

Development assetsExploration assetsMining assetsNon-mining assetsCapital construction in-progressTotal
US$mUS$mUS$mUS$mUS$mUS$m
Accumulated depreciation, amortisation
Balance at 1 January 2022--(1,304)(40)-(1,344)
Charge for the year--(345)(9)-(354)
Eliminated on disposal of subsidiaries (Note 3)--10--10
Impairment recognised during the year (Note 14)(334)(2)(418)(4)(43)(801)
Disposals and write-offs including fully depleted mines--148--148
Translation to presentation currency82-75-8165
Balance at 31 December 2022(252)(2)(1,834)(53)(35)(2,176)
Charge for the year--(297)(7)-(304)
Transfers202-(214)-12-
Eliminated on disposal of subsidiaries (Note 3)--101-11
Reversal of Impairment/(Impairment) recognised during the year, net (Note 14)8(27)19-(126)(126)
Disposals and write-offs including fully depleted mines-16522-70
Translation to presentation currency352334136390
Balance at 31 December 2023(7)(11)(1,930)(44)(143)(2,135)

Net book value
31 December 2022248831,909401,1123,392
31 December 20231581001,795309152,998

Mining, exploration and development assets at 31 December 2023 included mineral rights with a net book value of US$ 621 million (31 December 2022: US$ 713 million) and capitalised stripping costs with a net book value of US$ 262 million (31 December 2022: US$ 277 million). Mineral rights of the Group comprise assets acquired upon acquisition of subsidiaries.
Disposed and written off assets included fully depreciated items of US$ 21 million (year ended 31 December 2022: US$ 153 million and US$ 121 million, respectively).
No property, plant and equipment was pledged as collateral at 31 December 2023 and at 31 December 2022.
16.INVESTMENTS IN ASSOCIATES AND JOINT VENTURES
31 December 2023 31 December 2022
Voting power %Carrying Value Voting power %Carrying Value
US$m US$m

Interests in associates and joint ventures
GRK Amikan LLC (Veduga) (Note 3) 49.9 121 n/a -
Individually immaterial investments 6 6
Total 127 6

Loans forming part of net investment in joint ventures
Individually immaterial investments 2 7
Total 2 7
Total investments in associates and joint ventures129 13

Movement during the reporting periods was as follows:
Year ended
31 December 202331 December 2022
US$m US$m

At 1 January13 28
Impairment recognised-(24)
Fair value of interest in joint venture retained (Note 3)1103
Consolidated as subsidiaries (Note 3)(11)-
Loans advanced forming part of net investment114
Share of loss in joint ventures(2)-
Currency translation adjustment82
Total at 31 December12913

Summarised financial position of the investments
31 December 2023 31 December 2022
Amikan Non-significant investments Non-significant investments
US$m US$m US$m

Non-current assets364 4 13
Current assets12 1 5
Non-current liabilities(40) (2) (5)
Current liabilities(94) - (1)
Net assets242 3 12

Reconciliation of Amikan net assets to the investment recognised in the Group balance sheet
Group interest49,9%
Net assets242
Group's ownership interest121
Carrying value of the investment121

17.INVENTORIES
Year ended
31 December 2023 31 December 2022
US$m US$m
Inventories expected to be recovered after twelve months
Ore stock piles51 89
Work in-process13-
Сopper, gold and silver concentrate8 10
Consumables and spare parts43 34
Total non-current inventories 115 133

Inventories expected to be recovered in the next twelve months
Сopper, gold and silver concentrate324 277
Ore stock piles208 229
Work in-process146 121
Doré70 55
Metal for refining25 20
Refined metals45 3
Total current metal inventories 818 705

Consumables and spare parts360 352
Total current inventories 1,178 1,057

Write-downs of metal inventories to net realisable value
The Group recognised the following write-downs and reversals to net realisable value of its metal inventories:
Year ended
31 December 202331 December 2022
US$mUS$m
Ore stock piles (6) (28)
Ore in heap leach piles 15 (31)
Сopper, gold and silver concentrate (1) (6)
Total 8 (65)

The key assumptions used as of 31 December 2023 in determining net realisable value of inventories (including the commodity price assumptions for long-term stockpiles) are described in Note 2 “Use of estimates” section. For short-term metal inventories, applicable quoted forward prices as of 31 December 2023 were used: gold and silver prices of US$ 2,128 per ounce (2022: US$ 1,874) and US$ 24.8 per ounce (2022: US$ 24.6), respectively.
During the year ended 31 December 2023 the Group recognised a write-down of consumables and spare parts of US$ 2 million (year ended 31 December 2022: reversal of US$ 1 million).
The amount of inventories held at net realisable value at 31 December 2023 amounted to US$ 81 million (31 December 2022: US$ 95 million).

18.BORROWINGS
Actual interest rate at31 December 202331 December 2022
Type of rate 31 Dec 202331 Dec 2022CurrentNon-currentTotalCurrentNon-currentTotal
Secured loans from third parties US$mUS$mUS$mUS$mUS$mUS$m
US Dollar denominatedfixed4.32%2.68% 27 114 141 33 158 191
Total secured loans from third parties 27 114 141 33 158 191
Unsecured loans from third parties
US Dollar denominatedfloating6.74%5.69% 240 100 340 149 339 488
US Dollar denominatedfixed3.50%3.75%432 274 706 43 1,206 1,249
Euro denominatedfloating4.32%0.98% 2 18 20 2 19 21
RUB denominatedfloating17.95%9.35% 20 694 714 132 518 650
RUB denominatedfixed13.17%8.03% 19 142 161 3 202 205
CNY denominatedfloating4.95%3.50% - 70 70 69 70 139
CNY denominatedfixed5.54%5.99% 265 808 1,073 83 - 83
Total unsecured loans from third parties 978 2,106 3,084 481 2,354 2,835
Total loans from third parties 1,005 2,220 3,225 514 2,512 3,026

Bank loans
The Group has a number of borrowing arrangements with various lenders. These borrowings consist of unsecured and secured loans and credit facilities as detailed above.
Movements in borrowings are presented in Note 23. The Group complied with its debt covenants throughout 2023 and 2022. The table below summarises maturities of borrowings:
Year ended
31 December 2023 31 December 2022
US$m US$m
Less than 1 year 1,005 514
1-5 years 2,208 2,332
More than 5 years 12 180
Total 3,225 3,026

19.COMMITMENTS AND CONTINGENCIES
Commitments
Capital commitments
The Group’s contractual capital expenditure commitments as of 31 December 2023 amounted to US$ 171 million (2022: US$ 279 million).
Nezhda power line
The Group’s lease commitments, representing variable lease payments related to the Nezhda grid power line and substation, were estimated at US$ 24 million (undiscounted), which will be expensed as incurred (2022: US$ 36 million).
Contingent liabilities
Taxation
Russian and Kazakhstan tax, currency and customs legislation is subject to varying interpretations, and changes, which can occur frequently. Management’s interpretation of such legislation as applied to the transaction and activity of the companies of the Group may be challenged by the relevant regional and federal authorities and as a result, significant additional taxes, penalties and interest may be assessed. Fiscal periods remain open to review by the tax authorities in respect of taxes for three and five calendar years preceding the year of review for Russia and Kazakhstan respectively. Under certain circumstances reviews may cover longer periods.
Management has identified a total exposure (covering taxes and related interest and penalties) of US$ 41 million in respect of contingent liabilities (2022: US$ 125 million), mainly related to income tax as described in Note 13.

20.FINANCIAL INSTRUMENTS

Major categories of financial instruments
Year ended
31 December 2023 31 December 2022
US$m US$m
Financial assets
Derivatives designated in hedge relationships
Interest rate swaps 8 16

Financial assets at FVTPL
Receivables from provisional copper, gold and silver concentrate sales 135 54
Contingent consideration receivable 4 17
Shares held at FVTPL 2 1

Financial assets at amortised cost, including cash and cash equivalents
Cash and cash equivalents (Note 23) 842 633
Other receivables 126 49
Non-current loans and receivables 87 15
Total financial assets 1,204 785

Financial liabilities
Financial liabilities at FVTPL
Contingent consideration liability (Note 23) 44 36
Royalty payable (Note 23) 24 24

Financial liabilities at amortised cost
Borrowings (Note 18) 3,225 3,026
Deferred consideration (Note 23) - 85
Trade and other payables 148 171
Total financial liabilities 3,441 3,342

The Group’s principal financial liabilities comprise borrowings, derivatives, trade and other payables. The Group has various financial assets such as accounts receivable, loans advanced and cash and cash equivalents.
Trade and other payables exclude employee benefits and social security.
Interest expense, calculated using effective interest method, arising on financial liabilities at amortised costs is disclosed in Note 23.
The main risks arising from the Group’s financial instruments are foreign currency and commodity price risk, interest rate, credit and liquidity risks.
At the end of the reporting period, there were no significant concentrations of credit risk for receivables at FVTPL. The carrying amount reflected above represents the Group's maximum exposure to credit risk for such receivables.
Presented below is a summary of the Group’s accounts receivable with embedded derivative recorded on the condensed consolidated statement of financial position at fair value.
As of 31 December 2023, accounts receivable with embedded derivatives recognised at fair value amounted to US$ 135 million (31 December 2022: US$ 54 million) and represented receivables from provisional metal concentrate sales. In 2023 gains recognised on revaluation of these instruments amounted to US$ 4 million (2022: US$ 17 million) and was recorded within revenue.
Fair value of financial instruments
The following table provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, grouped into Levels 1 to 3 based on the degree to which the fair value is observable as follows:
Level 1 fair value measurements are those derived from quoted prices (unadjusted) in active markets for identical assets or liabilities;
Level 2 fair value measurements are those derived from inputs other than quoted prices included within level 1 that are observable for the asset or liability, either directly or indirectly; and
Level 3 fair value measurements are those derived from valuation techniques that include inputs for the asset or liability that are not based on observable market data (unobservable inputs).
At 31 December 2023 and 31 December 2022, the Group held the following financial instruments:
31 December 2023
Level 1 Level 2 Level 3 Total
US$m US$m US$m US$m

Receivables from provisional copper, gold and silver concentrate sales- 135 - 135
Interest rate swaps-8-8
Contingent consideration receivable- - 4 4
Shares held at FVTPL2 - - 2
Royalty liabilities payable--(24)(24)
Contingent consideration liability (Note 23)- - (44)(44)
Total 2 143 (64)81

31 December 2022
Level 1Level 2Level 3Total
US$mUS$mUS$mUS$m

Receivables from provisional copper, gold and silver concentrate sales - 54 - 54
Interest rate swaps - 16 - 16
Contingent consideration receivable - - 17 17
Shares held at FVTPL 1 - - 1
Royalty liabilities payable- - (24) (24)
Contingent consideration liability (Note 23) - - (36) (36)
Total 1 70 (43) 28

During the reporting year, there were no transfers between Level 1 and Level 2.
The Group recognised the following gains and loss from revaluation of its Level 3 financial instruments:
Year ended
31 December 2023 31 December 2022
US$m US$m
Loss on contingent consideration receivable revaluation (4) (17)
(Loss)/gain on contingent consideration payable revaluation (4) 3
Change in fair value of shares held at FVTPL - (4)
Loss on royalty payable revaluation - (2)
Total change in fair value of financial instruments (8) (20)

The carrying values of cash and cash equivalents, trade and other receivables, trade and other payables and short-term debt recorded at amortised cost approximate to their fair values because of the short maturities of these instruments. Long-term loans to related parties (Note 22) are discounted at rates obtained from active capital markets. The estimated fair value of the Group’s debt, calculated using the market interest rate available to the Group as of 31 December 2023, was US$ 2,699 million (2022: US$ 2,615 million), and the carrying value as of 31 December 2023 was US$ 3,225 million (2022: US$ 3,026 million) (see Note 18).
As of 31 December 2023 the Group held several interest rate swap contracts, recognised within non-current accounts receivables and other financial instruments in the amount of US$ 8 million (31 December 2022: US$ 16 million). All interest rate swap contracts to pay fixed and receive floating interest payments are designated as cash flow hedges to reduce the Group’s cash flow exposure resulting from variable interest rates on borrowings. As the critical terms of the interest rate swap contracts and their corresponding hedged items are the same, the Group performs a qualitative assessment of effectiveness and it is expected that the value of the interest rate swap contracts and the value of the corresponding hedged items will systematically change in opposite direction in response to movements in the underlying interest rates. As of 31 December 2023 and 31 December 2022 it was determined that there is no hedge ineffectiveness identified and therefore change of fair value was recognised within other comprehensive income.
Receivables from provisional copper, gold and silver concentrate sales
The fair value of receivables arising from copper, gold and silver concentrate sales contracts that contain provisional pricing mechanisms is determined using the appropriate quoted forward price from the exchange that is the principal active market for the particular metal. As such, these receivables are classified within Level 2 of the fair value hierarchy.
Valuation methodologies used in the measurement of fair value for Level 3 financial assets and financial liabilities
The main level 3 inputs used by the Group in measuring the fair value of contingent consideration assets and liabilities, represented by various royalties and net smelter returns (NSR), are derived and evaluated as follows:
The relevant valuation model simulates expected production of metals at respective mines and are based on life of mine models prepared using applicable ore reserves and mineral resource estimations;
Commodity prices - Commodity prices are based on latest internal forecasts, benchmarked against external sources of information. The prices applied are consistent with those described in Note 2.
Discount rates – The Group used a post-tax real discount rate of 12.5% (2022: 14.1%) as described in Note 2. For the Monte-Carlo modelling, where inflation is incorporated into volatility estimation, a nominal discount rate of 15.1% (2022: 16%) is applied.
Where the percentage of net smelter return (NSR) or royalty receivable or payable depends on commodity prices or foreign exchange rates reaching certain levels, the Group applies the Monte-Carlo modelling to incorporate the volatility measure into the valuation, which is applied to the prevailing market prices/rates as of the valuation date. The Monte-Carlo modelling is applied to Prognoz (NSR) contingent considerations payable and all contingent considerations receivable.
The key assumptions used in the Monte-Carlo calculations are set out below:

Price as of valuation date per ounce/tonne, $USVolatility, %%Constant correlation to gold, %%
Gold2,06212.15%-15.18%n/a
Silver 23.7926.93%65.88%
Copper8,47616.34%(37.98)%
Zinc2,64124.89%29.53%
RUB rate89.688321.51%43.13%

Management consider that a reasonably possible change in a valuation assumption would not have a material impact on the condensed consolidated financial statements for contingent considerations receivables and payable.
21.STATED CAPITAL ACCOUNT
The movements in the Stated capital account in the year were as follows:
Stated capital accountStated capital accountShare capitalShare premiumTreasury shares
no. of sharesUS$mUS$mUS$mno. of shares

Balance at 31 December 2021473,626,2392,450---
Own shares exchanged during the year(39,070,838)---39,070,838
Own shares issued in exchange39,070,838----
Balance at 31 December 2022473,626,2392,450--39,070,838
Redomiciation to AIFC-(2,450)142,436-
Own shares exchanged during the year(2,543,840)---2,543,840
Own shares issued in exchange2,543,840----
Deferred shares issued18,902----
Balance at 31 December 2023473,645,141-142,43641,614,678

As a part of the re-domiciliation described in Note 1, in order to comply with the AIFC companies rules, the Company's shares were converted from 512,697,077 ordinary shares of no par value to 512,697,077 ordinary shares of US$ 0.03 each in the share capital of the Company. As result the Company recognised Share capital of US$ 14 million and Share premium of US$ 2,436 million, calculated as difference between Share capital and Stated capital account, previously recorded.
On 22 September 2022, the Board announced its intention to conduct an exchange offer. The exchange offer invited shareholders whose rights have been affected by the sanctions imposed on NSD, subject to fulfilling eligibility criteria, to tender such shares for exchange in consideration for the issuance of a certificated share, on a one-for-one basis.
The first exchange offer which was completed on 11 October 2023. 2,543,840 shares were repurchased during year ended 31 December 2023 (31 December 2022: 39,070,838 shares). The exchange of shares did not give rise to any cash settlement and hence does not give rise to any financial liability. The shares were exchanged at par, on a one-for-one basis and does not affect the Company’s net asset and resources position or capital structure.
As of 31 December 2023 total number of voting rights in the Company amounted to 473,645,141 ordinary shares of nominal value US$ 0.03 each (31 December 2022: 473,626,239 ordinary shares with no par value), each carrying one vote, and additionally the Company held 41,514,678 shares in treasury and such shares did not enjoy any voting or economic rights (31 December 2022: 39,070,838 shares).
Weighted average number of shares: Diluted earnings per share
Both basic and diluted earnings per share were calculated by dividing profit for the year attributable to equity holders of the parent by the weighted average number of outstanding common shares before/after dilution respectively. The calculation of the weighted average number of outstanding common shares after dilution is as follows:
Year ended
31 December 2023 31 December 2022

Weighted average number of outstanding common shares 473,645,141 473,626,239
Weighted average number of outstanding common shares after dilution
473,645,141 473,626,239

There were no adjustments required to earnings for the purposes of calculating the diluted earnings per share during the year ended 31 December 2023 (year ended 31 December 2022: nil). There are no dilutive potential ordinary shares with respect to earnings per share from continuing operations as these are out of money as of the reporting date (2022: no dilutive potential ordinary shares).
22.RELATED PARTIES
Related parties are considered to include shareholders, affiliates, associates, joint ventures and entities under common ownership and control with the Group and members of key management personnel.
During the period ended 31 December 2023 transactions with the related parties, represented by equity method investments, included miscellaneous purchases of US$ 4 million (year ended 31 December 2022: US$ 0.7 million) and various sales of US$ 0.5 million (year ended 31 December 2022: US$ 0.5 million).
Outstanding balances as of 31 December 2023 were represented by accounts receivable of US$ 1.2 million (31 December 2022: US$ 1.2 million) from equity method investments and long-term loans advanced to the joint venture amounting to US$ 64 million (Note 16). The loans bear 0% interest date up to the start of production with maturity of 5 years.
Loans provided to equity method investments, classified as loans forming part of net investment in joint ventures, are presented in Note 16.
The remuneration of directors and other members of key management personnel during the periods was as follows:
Year ended
31 December 2023 31 December 2022
US$mUS$m
Share-based payments-1
Short-term benefits of board members33
Short-term employee benefits16
Total 4 10



23.SUPPLEMENTARY CASH FLOW INFORMATION
Year ended Year ended
Note 31 December 2023 31 December 2022
US$m US$m

Profit before tax 843 (332)
Adjustments for:
Depreciation and depletion recognised in the statement of comprehensive income4261 282
Impairment of non-current assets, net14126 825
(Gain)/loss on disposal of subsidiaries3(113) 2
(Reversal)/write-down of inventories to net realisable value6(6) 64
Share-based compensation1011 13
Finance expenses12162 119
Finance income(27) (8)
Change in fair value of financial instruments208 20
Foreign exchange loss174 32
Other non-cash items21 12
1,460 1,029
Movements in working capital
Change in inventories (328) (269)
Change in VAT and other taxes 18 8
Change in trade and other receivables (159) (18)
Change in prepayments to suppliers (25) (31)
Change in trade and other payables (4) (29)
Change in prepayments received - (134)
Cash generated from operations 962 556
Interest paid (190) (123)
Interest received 19 7
Income tax paid (216) (234)
Net cash generated by operating activities 575 206

There were no significant non-cash transactions during the years ended 31 December 2023 and 31 December 2022, other than in respect of exchange of the ordinary shares (Note 21).
Cash outflows related to capitalised exploration amounted to US$ 11 million for the year ended 31 December 2023 (2022: US$ 15 million). During the year ended 31 December 2023, the capital expenditure related to the new projects, which increase the Group’s operating capacity amounts to US$ 237 million (2022: US$ 208 million).
Cash and cash equivalents
31 December 2023 31 December 2022
US$m US$m

Bank deposits -USD 17 468
- CNY 364 -
- KZT 104 15
- other currencies 39 75
Current bank accounts - USD 159 68
- CNY 107 -
- other currencies 52 7
Total 842 633

At 31 December 2023 cash balances included US$ 513 million of cash and cash equivalents (31 December 2022: US$ 118 million) held in Russia, that are subject to certain legal and sanctions restrictions and are therefore not available for general use of the Company (but fully available for use by Russian subsidiaries). The Group determined that these restrictions would not have any material effect on the Group’s liquidity position and its ability to finance its obligations.
Bank deposits as of 31 December 2023 were mainly presented by the US Dollar and CNY deposits, bearing an average interest rate of 2.98% and 4.04% per annum, respectively (2022: US Dollar deposits, bearing an average interest rate of 3.9% per annum).
Changes in liabilities arising from financing activities
The table below details changes in the Group's liabilities arising from financing activities, including both cash and non-cash changes. Liabilities from financing activities are those for which cash flow were, or future cash flows will be, classified in the Group's condensed consolidated cash flow statements as cash flows from financing activities.

Year ended 31 December 2023
BorrowingsContingent consideration payable at fair valueDeferred consideration payable at amortised costRoyalty payableLease liabilities

1 January3,026368524131
Cash inflow1,324----
Cash outlow(944)---(21)
Changes from financing cash flows380---(21)

Disposal of subsidiary--(88)--
Change in fair value, included in profit or loss-4---
Unwind of discount143-7
New leases and modifications----(14)
Lease termination----(7)
Net foreign exchange losses371646-
Exchange differences on translating foreign operations(553)(6)(4)(6)(26)
Other changes(181)8(85)-(40)

31 December3,22544-2470

Less current portion(1,005)(15)-(5)(18)
Total non-current liabilities at 31 December2,22029-1952



Year ended 31 December 2022
BorrowingsContingent consideration payable at fair valueDeferred consideration payable at amortised costRoyalty payableLease liabilities

1 January2,06463792136
Cash inflow3,885----
Cash outlow(3,029)(27)--(18)
Changes from financing cash flows856(27)--(18)

Additions as a result of acquisitions161----
Change in fair value, included in profit or loss-(3)-3-
Unwind of discount-36-7
Arrangement fee amortisation1----
New leases----123
Lease termination----(1)
Net foreign exchange losses(19)--(2)-
Exchange differences on translating foreign operations(37)--2(16)
Other changes106-63113

31 December3,026368524131

Less current portion(33)(9)-(5)(25)
Total non-current liabilities2,993278519106


24.SUBSEQUENT EVENTS
Оn 18 February 2024 the Group entered into contracts for the divestment of its Russian business through a sale of 100% JSC Polymetal’s shares to a third party, JSC Mangazeya Plus (the Purchaser). On 7 March 2024, following the receipt of required regulatory and shareholder approvals, the transaction was completed.
The transaction entailed US$ 50 million cash consideration which was paid to the Company at completion.
Prior to completion, an aggregate dividend of US$ 1,429 million (before tax) was paid by JSC Polymetal to the Company, of which US$ 278 million will be retained by the Company for its general corporate purposes and US$ 1,151 million were used to repay, and fully discharge, the intra-group debt and related interest owed to JSC Polymetal. Combined net cash proceeds from the Purchaser and through dividends retained by the Company, after tax of US$ 28 million, amounted to US$ 300 million.
Major classes of assets and liabilities of JSC Polymetal Group, net of dividends payable and intercompany loans receivable, that were settled in March 2024 before the actual disposal date and which will not be part of assets and liabilities of the divested subsidiaries, are presented below. Cash and cash equivalents balance as of 31 December 2023 was adjusted for the net outflow accordingly, including dividends tax effect.
31 December 2023
US$m
Assets
Property, plant and equipment 2,189
Investments in associates and joint ventures 123
Non-current accounts receivable 80
Deferred tax asset 186
Non-current inventories 74
Other non-current assets 87
Total non-current assets 2,739

Current inventories 904
Prepayments to suppliers 156
Income tax prepaid 9
VAT receivable 73
Trade and other receivables 310
Cash and cash equivalents 121
Total current assets 1,573
Total assets 4,312

Accounts payable and accrued liabilities (189)
Current borrowings (860)
Income tax payable (20)
Other taxes payable (57)
Other current liabilities (30)
Total current liabilities (1,156)

Non-current borrowings (1,863)
Deferred tax liability (44)
Other non-current liabilities (138)
Total non-current liabilities (2,045)
Total liabilities (3,201)
NET ASSETS 1,111

The rationale for the transaction is associated with the significant political and financial risks that the pre-divestment structure poses to the Group, as well as the difficulty and related uncertainty of executing any alternative transaction. Therefore management believes that the transaction terms do not represent an indicator of further impairment of any CGU within the JSC Polymetal Group. The impairment review conducted as of 31 December 2023 is described in Note 2.
25.SUPPLEMENTARY FINANCIAL INFORMATION ON DIVESTMENT (UNAUDITED)
The financial information below is to illustrate the financial effect of the divestment, so each caption of the consolidated statement of financial position and consolidated income statement was adjusted to exclude the amounts of JSC Polymetal Group. In contrast with the statement of financial position presented on the face of these consolidated financial statements intra-group balances with JSC Polymetal Group are not eliminated, instead they are treated as balances with a related party. Unrealised profits or losses are excluded from the inventory balances and accumulated profits of Polymetal International plc.
Additionally, the table below presents post-disposal Polymetal International plc pro forma financial information, which illustrates the impact of the sale transaction on the net assets of the Polymetal International plc as of 31 December 2023 as if it had taken place at that date and the results of operations of the Polymetal International plc as if the transaction had taken place at 1 January 2023.
Year ended Post-disposal pro forma based on year ended
31 December 2022 31 December 2023 31 December 2023
US$m US$m US$m
Assets
Property, plant and equipment717 809 809
Investments in associates and joint ventures10 6 6
Non-current accounts receivable13 27 27
Other non-current financial assets- 9 9
Non-current inventories24 41 41
Total non-current assets764 892 892

Current inventories146 274 274
Prepayments to suppliers36 24 24
Income tax prepaid21 37 37
VAT receivable25 58 58
Trade and other receivables17 24 24
Receivables from related parties100 - -
Dividends receivable from JSC Polymetal- 1,429 -
Other financial assets at FVTPL10 5 5
Cash and cash equivalents515 328 628
Total current assets870 2,179 1,050

Total assets1,634 3,071 1,942
Accounts payable and accrued liabilities(43) (126) (131)
Current borrowings(75) (145) (145)
Intercompany balances(1,097) (270) -
Income tax payable- - (6)
Other taxes payable(19) (24) (24)
Current portion of contingent consideration liability- (3) (3)
Total current liabilities(1,234) (568) (309)

Non-current borrowings(716) (357) (357)
Non-current borrowings to related parties(32) (766) -
Contingent and deferred consideration liabilities(98) (14) (14)
Deferred tax liability(57) (208) (65)
Environmental obligations(8) (17) (17)
Non-current lease liabilities(1) (1) (1)
Other non-current liabilities(5)(6) (6)
Total non-current liabilities(917) (1,369) (460)
Total liabilities(2,151) (1,937) (769)
NET ASSETS(517) 1,134 1,173



Year ended Post-disposal pro forma based on
31 December 2022 31 December 2023 31 December 2023
US$m US$m US$m
Revenue913 826 826
Cost of sales(407) (420) (420)
Gross profit506 406 406

General, administrative and selling expenses(48) (59) (59)
Other operating expenses, net (30) (16) (21)
Impairment of non-current assets- (16) (16)
Operating profit428 315 310

Foreign exchange gain, net214 171 171
Loss on disposal of subsidiaries(2) - -
Change in fair value of financial instruments(1) (2) (2)
Finance expenses(55) (90) (90)
Finance income5 6 6
Profit before income tax589 400 395

Income tax(51) (218) (75)
Profit from continuing operations538 182 320

Loss from discontinued operations - - (1,210)
Translation differences recycling on disposal of foreign operation (979)
Total from continuing and discontinued operations538 182 (1,869)


ALTERNATIVE PERFORMANCE MEASURES
Introduction
The financial performance reported by the Group contains certain Alternative Performance Measures (APMs), disclosed to complement measures that are defined or specified under International Financial Reporting Standards (IFRS). APMs should be considered in addition to, and not as a substitute for, measures of financial performance, financial position or cash flows reported in accordance with IFRS.
The Group believes that these measures, together with measures determined in accordance with IFRS, provide the readers with valuable information and an improved understanding of the underlying performance of the business.
APMs are not uniformly defined by all companies, including those within the Group’s industry. Therefore, the APMs used by the Group may not be comparable to similar measures and disclosures made by other companies.
Purpose
APMs used by the Group represent financial KPIs for clarifying the financial performance of the Group and measuring it against strategic objectives, given the following background:
-Widely used by the investor and analyst community in the mining sector and, together with IFRS measures, provide a holistic view of the Group;
-Applied by investors to assess earnings quality, facilitate period to period trend analysis and forecasting of future earnings, and understand performance through eyes of management;
-Highlight key value drivers within the business that may not be obvious in the financial statements;
-Ensure comparability of information between reporting periods and operating segments by adjusting for uncontrollable or one-off factors which impact upon IFRS measures;
-Used internally by management to assess the financial performance of the Group and its operating segments;
-Used in the Group’s dividend policy; and
-Certain APMs are used in setting management’s remuneration.
APMs and justification for their use
Group APMClosest equivalent IFRS measureAdjustments made to IFRS measureRationale for adjustments
Underlying net earningsProfit/(loss) for the financial period attributable to equity shareholders of the GroupWrite-down of metal inventory to net realisable value (post-tax)
Impairment/reversal of previously recognised impairment of non-current assets (post-tax)
Foreign exchange (gain)/loss (post-tax)
Change in fair value of contingent consideration liability (post-tax)
Gains/losses on acquisition, revaluation and disposals of interests in subsidiaries, associates and joint ventures (post-tax)
Excludes the impact of key significant one-off non-recurring items and significant non-cash items (other than depreciation) that can mask underlying changes in core performance.
Underlying earnings per shareEarnings per shareUnderlying net earnings (as defined above)
Weighted average number of outstanding common sharesExcludes the impact of key significant one-off non-recurring items and significant non-cash items (other than depreciation) that can mask underlying changes in core performance.
Underlying return on equityNo equivalentUnderlying net earnings (as defined above)
Average equity at the beginning and the end of reporting year, adjusted for translation reserveThe most important metric for evaluating a Group profitability
Measures the efficiency with which a company generates income using the funds that shareholders have invested.
Return on assetsNo equivalentUnderlying net earnings (as defined above) before interest and tax
Average total assets at the beginning and the end of reporting yearA financial ratio that shows the percentage of profit a company earns in relation to its overall resources.

Adjusted EBITDA Profit/(loss) before income taxFinance cost (net)
Depreciation and depletion
Write-down of metal and non-metal inventory to net realisable value
Impairment/reversal of previously recognised impairment of non-current assets
Share-based compensation
Bad debt allowance
Net foreign exchange gain/losses
Change in fair value of contingent consideration liability
Rehabilitation costs
Additional mining taxes, VAT, penalties and accrued interest
Gains/losses on acquisition, revaluation and disposals of interests in subsidiaries, associates and joint ventures Excludes the impact of certain non-cash elements, either recurring or non-recurring, that can mask underlying changes in core operating performance, to be a proxy for operating cash flow generation.
Net debtNet total of current and non-current borrowings
Cash and cash equivalentsNot applicableMeasures the Group’s net indebtedness that provides an indicator of the overall balance sheet strength.
Used by creditors in bank covenants.
Net debt/EBITDA ratioNo equivalentNot applicableUsed by creditors, credit rating agencies and other stakeholders.
Free cash flowCash flows from operating activity less cash flow from investing activitiesExcluding acquisition costs in business combinations and investments in associates and joint ventures
Excluding loans forming part of net investment in joint ventures
Excluding proceeds from disposal of subsidiariesReflects cash generating from operations after meeting existing capital expenditure commitments.
Measures the success of the Group in turning profit into cash through the strong management of working capital and capital expenditure.
Free cash flow post M&ACash flows from operating activity less cash flow from investing activitiesNot applicableFree cash flow including cash used in/received from acquisition/disposal of assets and joint ventures.
Reflects cash generation to finance returns to shareholders after meeting existing capital expenditure commitments and financing growth opportunities.
Total cash costs (TCC)Total cash operating costs
General, administrative & selling expensesDepreciation expense
Rehabilitation expenses
Write-down of inventory to net realisable value
Intersegment unrealised profit elimination
Idle capacities and abnormal production costs
Exclude corporate costs and costs related to development assets
Treatment charges deductions reclassification to cost of salesCalculated according to common mining industry practice using the provisions of Gold Institute Production Cost Standard.
Gives a picture of the Group current ability to extract its resources at a reasonable cost and generate earnings and cash flows for use in investing and other activities.
All-in sustaining cash costs (AISC)Total cash operating costs
General, administrative & selling expensesAISC is based on total cash costs, and adds items relevant to sustaining production such as other operating expenses, corporate level SG&A, and capital expenditures and exploration at existing operations (excluding growth capital). After tax all-in cash costs includes additional adjustments for net finance cost, capitalised interest and income tax paid. All-in costs include additional adjustments on that for development capital.Includes the components identified in World Gold Council’s Guidance Note on Non‐GAAP Metrics – All‐In Sustaining Costs and All‐In Costs (June 2013), which is a non‐IFRS financial measure.
Provides investors with better visibility into the true cost of production.